在石油工程项目中共涵盖了前期可行性研究、设计阶段、施工阶段、竣工阶段这几个环节部分,其中前期可行性研究方案得到总部审查并认可后,接下来就是明确该项目的具体投资,那么怎样根据投资限额标准合理控制建设项目投资,需加强管理工程各阶段造价,而在工程整体造价控制中设计阶段属于重点。本文将对石油工程项目设计阶段的投资造价控制进行具体分析。
In the petroleum engineering project, it covers some aspects of the preliminary feasibility study, design phase, construction phase and completion phase. After the preliminary feasibility study plan is reviewed and approved by the headquarters, the next step is to clarify the specific investment of the project. Then How to control the investment of construction projects reasonably according to the investment quota standard, it is necessary to strengthen the management cost of each stage of the project, and it is the key point in the design phase of the overall project cost control. This article will carry on the concrete analysis to the investment cost control in the petroleum engineering project design phase.