业界来信:我是国内某公司印尼某EPC电站项目的设计部经理,现在设计审批过程中我们与业主之间争议很大,主要涉及业主方在审批过程中,提出了很多附加功能要求,反复对我们的设计方案进行变更。我们认为,业主提出的修改要求属于变更性质,要求业主以变更的形式下达,而业主认为不属于变更,只是对承包商设计方案的完善,因此,很多图纸迟迟得不到审批,导致设计延误很严重,从而影响了工程进
Letter from the Industry: I am a design manager of a certain EPC project in Indonesia. Now we have a lot of controversies with the owners in the process of design and approval, which mainly involves many additional functional requirements raised by the owner in the approval process. Our design changes. In our opinion, the owners’ modification requests are of a changing nature and require the owners to release them in the form of changes. However, the owners do not consider the change as a modification of the contractor’s design proposal. Therefore, many drawings have not been approved for a long time, leading to design delays Very serious, thus affecting the progress of the project