Combined alkaline and ultrasonic pretreatment of sludge before aerobic digestion

来源 :环境科学学报(英文版) | 被引量 : 0次 | 上传用户:qf125228
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Alkaline and ultrasonic sludge disintegration can both be used as pretreatments of waste activated sludge (WAS) for improving the subsequent anaerobic or aerobic digestion. The pretreatment has been carried out using different combination of these two methods in this study. The effect was evaluated based on the quantity of soluble chemical oxygen demand (SCOD) in the pretreated sludge as well as the degradation of organic matter in the following aerobic digestion. For WAS samples with combined pretreatment, the released COD was in high level than those with ultrasonic or alkaline treatment. When combined with the same ultrasonic treatment, NaOH treatment resulted in more solubilization of WAS than Ca(OH)2. For combined NaOH and ultrasonic treatments with different sequences, the released COD were in the order: simultaneous treatment > ultrasonic treatment following NaOH treatment > NaOH treatment following ultrasonic treatment. For simultaneous treatment, low NaOH dosage (100 g/kg dry solid), short duration (30 min) of NaOH treatment, and low ultrasonic specific energy (7 500 kJ/kg dry solid) were beneficial for sludge disintegration. Using combined NaOH and ultrasonic pretreatment with the optimium parameters, the degradation efficiency of organic matter was increased from 38.0% to 50.7%, which is much higher than with ultrasonic (42.5%) or with NaOH pretreatment (43.5%) in the subsequent aerobic digestion at the same retention time.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
扬州市昭关船厂 (原江都市昭关船厂 )座落于昭伯湖畔大运河旁 ,从 1967年建造木质拖轮开始 ,至今已具备建造 50 0 0t级钢质非机动船、70 0kW以下钢质机动船的能力。 30多年的千
期刊
在建筑工程进行施工时大体积混凝土施工技术是经常被使用的一种技术,大体积混凝土施工技术的运用能够提高建筑工程的整体质量和安全.然而在实际施工中大体积混凝土施工技术要
在现代社会钢筋混凝土结构工程的实际施工过程中,混凝土结构的裂缝问题一直是困扰相关管理人员和基层施工人员的重要难题之一.大量项目数据信息和理论知识表明,混凝土结构裂
现如今土地资源越来越紧张,高层和超高层建筑越来越多,桩基工程作为高层建筑工程施工的基础,也是施工中的重要环节,对于整个高层建筑工程都具有非常重要的意义,所以在施工过
摘 要:本文对房屋建筑施工管理优化策略进行了全方位的分析,首先简要概述了加强房屋建筑施工管理优化的必要性,其次详细深入剖析了当前我国房屋建筑施工管理工作中存在的问题,接着笔者在结合自身多年专业理论知识与实践操作经验的基础上提出了几点行之有效的解决对策,旨在有效提升整体房屋建筑质量的安全稳定性与坚固性,进而更好的造福于广大人民群众。希望本文可以在一定程度上为相关的专业学者提供参考与借鉴,如有不足之处
城市化建设也逐渐进入发展的黄金时期,城市中建筑工程的数量和规模不断增加.建筑工程作为人们生活和工作的主要场所,其质量问题就成为社会的主要问题.建筑工程是一项比较复杂
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
随着国家政策的倾斜,以及在我国人口的大趋势下,建筑行业成为当今国民经济的支柱,越来越多的施工团队产生,因此施工质量成为各施工单位竞争的筹码.业主也同样注重着施工质量
本文从实行建筑机械施工安全管理的意义入手,站在操作人员素质、责任划分与监管体制的角度,全面分析其中存在的问题.并据此提出相应的解决措施,围绕建筑机械施工安全管理,注