沿太行高速公路新乡段工程项目属于建设类项目,水土保持监测时段包括施工准备期前和施工准备期至设计水平年两个时段。水土保持监测宜采用地面定点监测与定时实地调查、定期巡查、遥感监测相结合的方法。施工准备期前进行监测,取得本底数据,以便与施工期监测进行对比分析。沿太行高速公路新乡段工程水土保持监测内容包括:主体工程建设进度、工程建设扰动土地面积、水土流失灾害隐患、水土流失及其造成的危害、水土流失防治效果、水土保持管理等内容的监测。重点监测时段为施工期,重点监测部位取土场区和路基工程区,共布置34个水土保持监测点。
The project along the Xinxiang section of Taihang Expressway belongs to the category of construction projects. The water and soil conservation monitoring period includes two phases before construction preparation and construction preparation to design level. Soil and water conservation monitoring should use ground fixed-point monitoring and regular field surveys, regular inspections, remote sensing monitoring methods combined. Before the preparation period for construction monitoring, obtain the background data for comparison with construction monitoring. The monitoring of soil and water conservation along the Xinxiang section of Taihang Expressway includes: progress of main project construction, disturbed land area due to construction, hidden danger of soil erosion and soil erosion, soil erosion and its damage, prevention and control of water and soil loss, soil and water conservation management and so on. The key monitoring period is the construction period, the main monitoring site borrow soil area and roadbed engineering area, a total of 34 soil and water conservation monitoring sites are arranged.