中国人民建设银行投资调查部和投资研究所的“重新评价水电的经济性”一文,提出水电建设需要的投资多,工期长,发电设备利用小时数低,生产成本高,因而得出了水电的经济效益不如火电的结论,并提醒有关部门对水电建设计划和投资的安排,要“慎重决策”。对此,《水力发电》杂志已发表了一些文章,
The paper “Investigating the economics of hydropower” by the Investment Investigation Department and the Investment Research Institute of the People’s Construction Bank of China proposed that hydropower construction requires more investment, long construction period, low utilization hours of power generation equipment, and high production costs, resulting in hydropower The economic benefits are not as good as those of thermal power, and the related departments are reminded to “prudently make decisions” on the arrangements for hydropower construction plans and investments. In this regard, “Hydroelectric” magazine has published some articles.