工厂和车间计划机械的组织结构,决定於下面几个因素:(1)生产的类型(单件生产还是成批生产或大量生产),(2)生产的规模,取决於成品的数量或工人的数目,(3)工厂的生产组织,就是说车间的匾分,及其专业化的程度,(4)成品的性质;复杂的程度、劳动的消费量、精密度等等。这些生产的与技术的因素,对于计划机械的组织的影响,是互不相同的。比方说,要是其他的条件相
The organizational structure of the plant and workshop planning machinery is determined by the following factors: (1) the type of production (single-piece production or mass production or mass production), (2) the scale of production, depending on the number of finished products or workers Number, (3) Production organization of the factory, that is to say, the split of the workshop, the degree of specialization, (4) the nature of the finished product, the degree of complexity, the consumption of labor, precision, and so on. These production and technical factors are different from each other in planning the organization of the machinery. For example, if other conditions