论文部分内容阅读
第七项水暖隐蔽工程记录基本要求与第六项相同。不同的是,内容较简单。着重记录水暖管道在进和出的地下施工方法、内容。如图纸上明确要求,且完全照图施工,可在记录中标明,不然应详细叙述。
The seventh basic record of plumbing concealment works is the same as the sixth item. The difference is that the content is relatively simple. It focuses on recording underground construction methods and contents of plumbing pipes entering and exiting. Definite requirements are shown on the map paper, and the construction is fully based on the plan. It can be indicated in the record, otherwise it should be described in detail.