随着社会经济的不断发展,水利工程的建设也在不断扩大,施工现场用电是一个具有开放性以及临时性的特殊用电工程,特别是对于水利工程施工现场,由于水利施工的现场环境具有复杂多变的特点,因此,更应该注意临时用电的安全性。基于此针对水利工程施工现场采取的临时用电方案进行分析,阐述在施工现场接地装置的基本方式以及如何保护接地装置,探讨接地装置临时用电的安全性。
With the continuous development of society and economy, the construction of water conservancy projects is also constantly expanding. The electricity consumption at the construction site is an open and temporary special electric project, especially for the construction site of water conservancy projects. Since the site environment of water conservancy construction has Complex and changeable features, therefore, should pay more attention to the safety of temporary electricity. Based on this, the temporary electricity consumption plan adopted in the construction site of hydraulic engineering is analyzed. The basic method of grounding equipment at construction site and how to protect grounding equipment are discussed. The safety of temporary use of grounding equipment is discussed.