论文部分内容阅读
摘要:土建专业工程根据工程用途不同,通常包括土方开挖、主体结构及二次结构的施工等方面,由于分项工程多,其施工标准、施工工艺的不同,其施工质量、施工方法、施工规范及检验方法也不相同。工程施工过程的监理,重要的在于过程控制,通过总结事前控制、事中控制、事后控制的具体方法及内容,实现对施工过程的有效控制。结合本人在实际工作的体会,从事前、事中、事后控制几个方面谈谈土建专业监理工程师如何实施过程控制。
关键词:工程施工;工程监理;过程控制
Abstract: The civil engineering specialty according to different purposes, usually including earthwork excavation, the main structure and the two structure construction, the project, the construction standard, construction process, construction quality, construction method, construction specifications and test methods are not the same. Supervision of project construction process, process control is important, specific methods by summarizing prior control, process control, feedback control and content, realize the effective control of the construction process. With my experience in the practical work, engaged in before, during and after the event, control several aspects of civil engineering supervision engineer to implement process control.
Keywords: engineering construction; project management; process control
中圖分类号:TU71
一、严格审核施工组织设计(方案)是做好事前控制最基本的前提工作
施工单位进场后根据工程特点,确定编制了单位工程现场项目组织、施工进度计划、安全文明施工措施、施工方法及主要的施工技术措施、现场布置等。因此,在总监理工程师的指导下,认真审核施工组织设计(方案),是做好事前控制的必修课。
审查施工组织设计重点包括以下几个方面:(1)审查施工组织设计编制,审核批准程序是否齐全,公章日期是否完备,重点是否有安全文明生产的方案与措施。(2)本项目质量管理体系是否落实到人。(3)是否有符合工程特点的施工技术措施。(4)是否有相关专业分项的技术交底。(5)是否有施工质量保证措施,包括各分部工程质量目标,而质量目标是否符合合同需要,质量保证的主要措施又是否符合现场实际施工需要。(6)项目管理人员(特别是项目经理、安全员)、施工技术人员、特殊工种人员是否持证上岗。(7)总施工进度计划是否满足相关合同规定和施工需求。(8)安全文明施工措施是否符合工程实际,特别是重大危险源项目,是否有专项施工方案及应急预案。这里涉及到基坑开挖是否属于超4m深的基坑,深基坑必须有专门的施工方案,并须经有关专家论证。涉及到塔吊、人货电梯、外脚手架搭设、井架等重要设备的安全使用与监管,必须有专项使用方案,确定专人管理,使用过程有专人跟踪检查监督。
二、编制针对性强的监理实施细则是事前控制的必要依据
作为实施施工过程控制的操作性文件——监理实施细则,必须经总监理工程师审核批准。而其编写质量的高与低,就反映和体现专业监理工程师的专业水平,就成为监理过程中实施事中控制的重要依据。
作为一个专业监理工程师,怎样编写本专业的监理实施细则呢?一是看懂图纸,领会设计精神,理解设计意图,特别是对设计图纸中的新技术、新材料、新工艺要了解,要做到心中有数;二是结合现场实际,总结以往的监理工作经验,对重大危险源,要按照相关法律法规,相关规范标准采取相关措施,并对可能出现的质量通病,既有充分的思想准备,又必须有合适的处理方法,并作为重点写进细则中,在实施过程控制中加以控制。
三、认真准备做好图纸会审工作是实施过程控制的必要条件
工程开工的准备阶段,作为专业监理工程师,应认真细读施工图纸,会同安装、电气等专业监理工程师,对土方开挖、主体结构施工、室外工程配套施工等涉及的位置、尺寸影响,依照人防、消防、节能等方面的要求,予以通盘考虑,特别是参照新的施工规范标准,及时归纳整理图纸中的“错、漏、碰、缺”的部位,交相关设计人员作出变更,作为今后施工的依据。
四、施工工序的质量控制是实施过程控制的重要环节
施工工序质量对整个项目的质量起决定性作用,采取现场巡视、平行检查、旁站等手段,强化工序报验程序,再附以真实、详细的检查记录,就成为专业监理工程师最重要的监理工作。
(1)加强现场巡视工作,对施工现场全面巡查,发现施工过程中的问题及时纠正,做到不失时机地用监理工程师联系单、通知单或备忘录等形式来处理施工过程中所发现的问题。
(2)认真执行旁站监理规定,依照旁站监理方案,对施工过程中关键部位、关键程序进行跟踪,要求施工单位对关键部位、关键工序严格把关,及时将责任措施落实到施工班组,落实到每一个施工人员,及时收集相关数据资料,认真填写旁站记录。
(3)实施严格的隐蔽工程验收举措,及时检查关键部位、关键工序的施工,做到上一道工序没有完工,施工单位不得进行下一道工序的施工。对于隐蔽工程检查验收不合格,即不符合隐蔽验收条件的工程,要求施工单位立即整改,再按相关规定重新组织验收。只有验收合格,才能允许下道工序的施工,才能签认工序质量报验单,对隐蔽工程予以确认。
(4)会同建设方、施工方,以平行检查为重心,检查督促施工方相关作业班组(标段负责人),加强自身质量管理,及时发现施工过程中存在的质量问题,做好及时整改。对于涉及多工种或其他方面的施工问题,通过平行检查方式,及时解决存在的问题,确保施工质量,使施工进度不受影响。
(5)严格按照设计要求,对照施工标准、图集、相关规范要求严格控制施工过程,重点关注规范检验细节,以防质量通病的再发生。例如检查验收商住楼的坡屋面的钢筋绑扎现状,主体结构的柱筋锚入坡屋面的支梁(天沟)内,是采用梁包柱还是柱包梁的形式,就要看设计要求、规范标准要求,并做到方便施工绑扎为宜,事实上,由于钢筋绑扎受条件限制,必须做到不违背设计意图,又要按规范标准要求施工,二者必须兼顾。因此采用梁包柱形式,解决现实问题。又例如有抗震要求的商住楼,其主体框剪结构剪力墙中拉钩的布置,一般按梅花型等距离绑扎,为达到设计要求,也可以按矩形等距离绑扎。
五、实施事后控制进一步完善工程质量
实施过程控制采用事前、事中控制,难免会产生质量、进度、投资等方面的偏差,作为一名土建专业监理工程师,进一步做好事后控制,消除以上偏差,针对具体情况,制定合理的解决方案,很有必要。如某商住楼的二次结构施工中,出现3次M5水泥混合砂浆见证取样送检不合格的情况(其强度数据异常),我们一方面加强施工现场的监督管理,严格砂浆的配合比检查,严防使用砂浆王等不符要求的事件发生,对已经砌筑的内隔墙采用回弹检测(回弹结构报告显示,砌体强度符合要求)。另一方面进一步加强见证取样检测程序的管理,确保砌筑质量合格。
结合本工程实际,采取事前预控、事中监控、事后补充完善,成为专业监理工程师实施过程控制的有效途径,而要扎扎实实做好过程控制,需要专业监理工程师不断提高自身专业水平及协调能力,在总监理工程师的领导下,深入现场去发现问题,去解决各类问题。当然,监理工程师还担负着另一项重要的监理工作,那就是安全生产监管。在全面实施施工过程控制质量的同时,一定不能忽视安全施工这一重要环节,依照相关法律法规和相关标准规范要求,及时抓紧落实安全生产的各个环节,使工程质量有根本性的保证。
土建专业工程作为建筑项目中的一个重要方面,一般情况下占建筑项目投资比较大,涉及到的分项、分部工程较多,其施工质量的好与差,将会给整个工程竣工交付后的使用带来很大的影响,而作为土建专业监理工程师,充分发挥监理工程师现场监理的作用,就显得十分重要。
参考文献
[1] 王伟.建筑电气工程施工质量监理的关键问题[J]. 科技风. 2008(14)
[2] 范正朝.区域供水工程施工监理的质量控制[J]. 科技风. 2010(12)
[3] 孙磊.住宅建筑外墙渗漏的原因分析及防治措施[J]. 大众科技. 2007(02)
[4] 任德瑜,王树用,牟玉玲.严格事前控制,确保施工质量[J]. 今日科苑. 2007(18)
[5] 王剑云,徐尉竣.浅谈装修工程施工阶段监理的质量控制[J]. 黑龙江科技信息. 2009(25)
关键词:工程施工;工程监理;过程控制
Abstract: The civil engineering specialty according to different purposes, usually including earthwork excavation, the main structure and the two structure construction, the project, the construction standard, construction process, construction quality, construction method, construction specifications and test methods are not the same. Supervision of project construction process, process control is important, specific methods by summarizing prior control, process control, feedback control and content, realize the effective control of the construction process. With my experience in the practical work, engaged in before, during and after the event, control several aspects of civil engineering supervision engineer to implement process control.
Keywords: engineering construction; project management; process control
中圖分类号:TU71
一、严格审核施工组织设计(方案)是做好事前控制最基本的前提工作
施工单位进场后根据工程特点,确定编制了单位工程现场项目组织、施工进度计划、安全文明施工措施、施工方法及主要的施工技术措施、现场布置等。因此,在总监理工程师的指导下,认真审核施工组织设计(方案),是做好事前控制的必修课。
审查施工组织设计重点包括以下几个方面:(1)审查施工组织设计编制,审核批准程序是否齐全,公章日期是否完备,重点是否有安全文明生产的方案与措施。(2)本项目质量管理体系是否落实到人。(3)是否有符合工程特点的施工技术措施。(4)是否有相关专业分项的技术交底。(5)是否有施工质量保证措施,包括各分部工程质量目标,而质量目标是否符合合同需要,质量保证的主要措施又是否符合现场实际施工需要。(6)项目管理人员(特别是项目经理、安全员)、施工技术人员、特殊工种人员是否持证上岗。(7)总施工进度计划是否满足相关合同规定和施工需求。(8)安全文明施工措施是否符合工程实际,特别是重大危险源项目,是否有专项施工方案及应急预案。这里涉及到基坑开挖是否属于超4m深的基坑,深基坑必须有专门的施工方案,并须经有关专家论证。涉及到塔吊、人货电梯、外脚手架搭设、井架等重要设备的安全使用与监管,必须有专项使用方案,确定专人管理,使用过程有专人跟踪检查监督。
二、编制针对性强的监理实施细则是事前控制的必要依据
作为实施施工过程控制的操作性文件——监理实施细则,必须经总监理工程师审核批准。而其编写质量的高与低,就反映和体现专业监理工程师的专业水平,就成为监理过程中实施事中控制的重要依据。
作为一个专业监理工程师,怎样编写本专业的监理实施细则呢?一是看懂图纸,领会设计精神,理解设计意图,特别是对设计图纸中的新技术、新材料、新工艺要了解,要做到心中有数;二是结合现场实际,总结以往的监理工作经验,对重大危险源,要按照相关法律法规,相关规范标准采取相关措施,并对可能出现的质量通病,既有充分的思想准备,又必须有合适的处理方法,并作为重点写进细则中,在实施过程控制中加以控制。
三、认真准备做好图纸会审工作是实施过程控制的必要条件
工程开工的准备阶段,作为专业监理工程师,应认真细读施工图纸,会同安装、电气等专业监理工程师,对土方开挖、主体结构施工、室外工程配套施工等涉及的位置、尺寸影响,依照人防、消防、节能等方面的要求,予以通盘考虑,特别是参照新的施工规范标准,及时归纳整理图纸中的“错、漏、碰、缺”的部位,交相关设计人员作出变更,作为今后施工的依据。
四、施工工序的质量控制是实施过程控制的重要环节
施工工序质量对整个项目的质量起决定性作用,采取现场巡视、平行检查、旁站等手段,强化工序报验程序,再附以真实、详细的检查记录,就成为专业监理工程师最重要的监理工作。
(1)加强现场巡视工作,对施工现场全面巡查,发现施工过程中的问题及时纠正,做到不失时机地用监理工程师联系单、通知单或备忘录等形式来处理施工过程中所发现的问题。
(2)认真执行旁站监理规定,依照旁站监理方案,对施工过程中关键部位、关键程序进行跟踪,要求施工单位对关键部位、关键工序严格把关,及时将责任措施落实到施工班组,落实到每一个施工人员,及时收集相关数据资料,认真填写旁站记录。
(3)实施严格的隐蔽工程验收举措,及时检查关键部位、关键工序的施工,做到上一道工序没有完工,施工单位不得进行下一道工序的施工。对于隐蔽工程检查验收不合格,即不符合隐蔽验收条件的工程,要求施工单位立即整改,再按相关规定重新组织验收。只有验收合格,才能允许下道工序的施工,才能签认工序质量报验单,对隐蔽工程予以确认。
(4)会同建设方、施工方,以平行检查为重心,检查督促施工方相关作业班组(标段负责人),加强自身质量管理,及时发现施工过程中存在的质量问题,做好及时整改。对于涉及多工种或其他方面的施工问题,通过平行检查方式,及时解决存在的问题,确保施工质量,使施工进度不受影响。
(5)严格按照设计要求,对照施工标准、图集、相关规范要求严格控制施工过程,重点关注规范检验细节,以防质量通病的再发生。例如检查验收商住楼的坡屋面的钢筋绑扎现状,主体结构的柱筋锚入坡屋面的支梁(天沟)内,是采用梁包柱还是柱包梁的形式,就要看设计要求、规范标准要求,并做到方便施工绑扎为宜,事实上,由于钢筋绑扎受条件限制,必须做到不违背设计意图,又要按规范标准要求施工,二者必须兼顾。因此采用梁包柱形式,解决现实问题。又例如有抗震要求的商住楼,其主体框剪结构剪力墙中拉钩的布置,一般按梅花型等距离绑扎,为达到设计要求,也可以按矩形等距离绑扎。
五、实施事后控制进一步完善工程质量
实施过程控制采用事前、事中控制,难免会产生质量、进度、投资等方面的偏差,作为一名土建专业监理工程师,进一步做好事后控制,消除以上偏差,针对具体情况,制定合理的解决方案,很有必要。如某商住楼的二次结构施工中,出现3次M5水泥混合砂浆见证取样送检不合格的情况(其强度数据异常),我们一方面加强施工现场的监督管理,严格砂浆的配合比检查,严防使用砂浆王等不符要求的事件发生,对已经砌筑的内隔墙采用回弹检测(回弹结构报告显示,砌体强度符合要求)。另一方面进一步加强见证取样检测程序的管理,确保砌筑质量合格。
结合本工程实际,采取事前预控、事中监控、事后补充完善,成为专业监理工程师实施过程控制的有效途径,而要扎扎实实做好过程控制,需要专业监理工程师不断提高自身专业水平及协调能力,在总监理工程师的领导下,深入现场去发现问题,去解决各类问题。当然,监理工程师还担负着另一项重要的监理工作,那就是安全生产监管。在全面实施施工过程控制质量的同时,一定不能忽视安全施工这一重要环节,依照相关法律法规和相关标准规范要求,及时抓紧落实安全生产的各个环节,使工程质量有根本性的保证。
土建专业工程作为建筑项目中的一个重要方面,一般情况下占建筑项目投资比较大,涉及到的分项、分部工程较多,其施工质量的好与差,将会给整个工程竣工交付后的使用带来很大的影响,而作为土建专业监理工程师,充分发挥监理工程师现场监理的作用,就显得十分重要。
参考文献
[1] 王伟.建筑电气工程施工质量监理的关键问题[J]. 科技风. 2008(14)
[2] 范正朝.区域供水工程施工监理的质量控制[J]. 科技风. 2010(12)
[3] 孙磊.住宅建筑外墙渗漏的原因分析及防治措施[J]. 大众科技. 2007(02)
[4] 任德瑜,王树用,牟玉玲.严格事前控制,确保施工质量[J]. 今日科苑. 2007(18)
[5] 王剑云,徐尉竣.浅谈装修工程施工阶段监理的质量控制[J]. 黑龙江科技信息. 2009(25)