为了进一进提高混凝土轨枕质量、节约水泥、控制生产线的振动噪声,对老厂进行振捣工艺改造,铁道部建厂局设计处与西安冶金建筑学院和电子工业部七○九厂振动设备设计研究所协作,于1983年共同进行了“轨枕混凝土变频变幅振捣工艺研究”。通过1343组试件试验,研究了近70种不同振捣制度对轨枕干硬性混凝土物理力
In order to improve the quality of concrete sleepers, save cement, and control the vibration and noise of the production line, the vibrating process of the old factory was transformed. The design office of the Ministry of Railways Construction Bureau and the vibration equipment design of the Xi'an Metallurgical Construction Institute and the 701 Industrial Department of the Ministry of Industry In collaboration with the institute, in 1983, the “Research on Variable Frequency Vibrating Process for Concrete Sleeper Concrete” was conducted. Through the test of 1343 sets of specimens, we studied the physical force of nearly 70 different vibrator systems on the sleeper stiff concrete.