1辆新型工程车在工程装备试验基地进行推土清障作业时,其推土装置顶推架上的顶推头突然发生断裂。经了解,该工程车在推土清障时遇到障碍物,驾驶人员将该工程车倒车1m多以后,再向前行驶并冲击障碍物时,发生顶推头断裂故障。为此,我们在分析顶推头结构的基础上,对顶推头断裂原因进行分析,找出断裂原因,并采取改进措施,以期提高顶推头的可靠性和使用寿命。1.顶推头结构特点和工艺要求该新型工程车推土装置由顶推架1、左推土铲2、右推土铲3、变铲缸4、起升缸5和顶推头6等组成,如图1所示。
A new construction vehicle in the engineering equipment test base for bulldozing operations, the bulldozers pushed on the top of the thruster suddenly broke. It is understood that the engineering vehicles encountered obstacles in the bulldozing obstacle clearance, the driver of the project after reversing the truck more than 1m, then forward and impact the obstacles, the top thrust fault occurs. Therefore, on the basis of analyzing the structure of the jacking head, we analyze the reason of the jacking head fracture, find the reason of the fracture, and take the improvement measures to improve the reliability and service life of the jacking head. 1. Jacking head structural features and process requirements The new bulldozers for construction vehicles consist of jacking frame 1, left dozer 2, right dozer 3, changing cylinder 4, lifting cylinder 5 and jacking head 6 Composition, as shown in Figure 1.