论文部分内容阅读
上海市军工路隧道位于上海市东北角,它是中环线最后一个过江工程,该地区周围老式建筑较多,居民区密集,前后8次穿越防汛墙,环境保护要求高。上海市军工路隧道建设秉承了隧道股份“关注细节,过程控制”的精细化管理理念,切实抓好每道施工工序的质量,用科学的管理、严格的制度来创造优质工程。在施工过程中对于关键控制区域采取了设置剪力销环管片以及管片内弧面钢板,以增强管片的连接刚度,最大限度的减少成环隧道的不
Shanghai Military Road Tunnel is located in the northeast corner of Shanghai. It is the last cross-river project on the Central Link. There are more old-style buildings around the area and densely populated residential areas. Crossing the flood wall eight times before and after the project requires high environmental protection. Shanghai Military Road Tunnel adhering to the tunnel shares “attention to detail, process control ” of the fine management philosophy, and earnestly grasp the quality of each construction process, with scientific management, strict system to create quality projects. In the construction process for the key control area taken to set the shear pin tube section and the inner arc plate steel plate to enhance the connection stiffness of the segment to minimize the ring tunnel does not