摘要: 建筑消防设施是建筑物中一项必不可少的建筑安装工程。随着建筑业的发展,对消防安全程度、可靠性等方面提出了更高的要求。施工质量的好坏,直接影响着建筑消防设施的正常运行。从日常施工质量的监督检查与工程验收情况来看,施工过程中还存在一些问题,结合工程具体安装施工过程的实际情况, 对建筑消防安装施工过程中的若干问题进行了分析, 并提出了相应的技术措施, 解决了安装过程中繁琐的问题, 提高工程安装质量, 确保安全。
关键词:消防安装, 试验,施工验收
Abstract: the construction of fire control facilities is an essential building construction and installation. Along with the development of construction industry, the degree of fire safety, reliability put forward higher request. The quality of the construction quality, the direct impact on the normal operation of the facilities of the fire. From daily construction quality supervision and inspection and acceptance of work situation, the construction process still has some problems, and combined with engineering specific installation construction process the actual situation, the construction process of building fire installation some problems in the analysis, and put forward the corresponding technical measures to solve the problems in the process of installation of trival, improving engineering installation quality, ensure security.
Keywords: fire installation, test, construction inspection
中图分类号:TU74文献标识码:A 文章编号:
1、消防安装
随着我国消防法的不断深入贯彻, 我国建筑市场的竞争规则 、技术标准 、经营方式 ,服务模式都将进一步与国际接轨, 在建筑市场的影响下, 现代化的厂房对安全功能, 尤其是消防设施的安装工程质量要求也越来越高, 但现实是消防设施尤其是消防管道的安装是在土建等主体工程完成后方可进行, 而此时电气安装工程 ,设备安装工程也在抢工期, 当消防管道安装与其他安装工程发生冲突时, 必会为其他抢工期 保生产的工程让路, 这就给消防安装质量带来了隐患。
2、安装及实验
下面就建筑消防安装施工过程中所产生的若干问题进行了分析,建设部颁发的自动喷水灭火系统施工及验收规范中规定:管网安, 当管子公称直径小于或等于100 mm 时, 应采用螺纹连接, 当管子公称直径大于 100 mm 时, 可采用焊接或法兰连接通过多年实践, 对标准进行了修定, 于2005 年5 月16 日颁发了GB50261- 2005 自动喷水灭火系统施工及验收规范确定于2005 年7 月1 日实施, 在规范第5. 1. 2 条指出应采用螺纹沟槽式管件或法兰连接, 因为从工程实践证明, 消防管道焊接的接口处容易发生锈蚀, 产生的氧化铁脱落后极易堵塞管道和喷头, 影响系统的正常使用。 管道采用螺纹沟槽式管件或法兰连接安装简便, 工期短, 并且能确保工程质量, 同时在使用过程中的维修管理也带来方便。 但由于多年来, 工程人员已习惯了而且焊接工艺施工简单, 初期造价低, 从而造成工程施工中极易出现消防管道焊接现象, 消防工程是百年大计, 因此要从设计消防管道的焊接工艺,质检、 消防验收等多方位加强管理, 确保从根本上杜绝消防管道的焊接现象在消防供水设施安装中也存在着一些问题。 在 GB 50261-2005 自动喷水灭火系统施工及验收规范中,第 4 章规定消防水泵的出水管上应安装止回阀 ,控制阀和压力表, 系统的总出水管上还应安装压力表和泄压阀; 安装压力表时应加缓冲装置 压力表和缓冲装置之间应安装旋塞、 消防水池 、消防水箱的溢流管, 泄水管不得与生产或生活用水的排水系统直接相连, 应采用间接排水方式, 而在施工时经常忽视消防用水与其他用水合并的水箱不能作为他用的技术设施, 以及不设置止回阀 ,不设置缓冲装置不按规范要求保证消防水箱应储存10 min 的消防用量, 导致无法确保消防系统的正常使用。
3、质量管理
在 GB 50261- 2005 自动喷水灭火系统施工及验收规范中第6 章强制性条文规定, 管网安装完毕后, 应对其进行强度试验严密性试验和冲洗 ,即管网试压分强度和严密性两步进行, 当系统设计工作压力等于或小于1. 0 MPa 时, 水压强度试验压力应为设计工作压力的1. 5 倍, 并不低于1. 4 MPa; 当系统设计工作压力大于 1. 0 MPa 时, 水压强度试验压力应为该工作压力加0. 4 MPa 水压严密性试验应在水压强度试验和管网冲洗合格后进行, 试验压力为设计工作压力。 目前, 有些工地为抢工期, 只对管网进行水压严密性试验或者强度试验压力也不符合设计和范要求, 这就给系统的正常生产运行带来了隐患。如果消防工程专业施工企业的主要技术负责人或现场施工负规责人员,对整个工程防灾系统逻辑功能不具备全面清楚的理解把握, 而土建总包方技术负责人又不清楚这些消防安装工程, 往往造成工程最后阶段迟迟调试不完, 甚至验收不合格的被动局面有鉴于此, 施工企业应当从多方面加强消防工程的施工质量管理:
(1) 要对工程中使用的消防产品和辅助产品 材料进行复核查验, 做好记录, 不合格的决不能使用 切实做到正确的符合规范要求的安装施工。
(2) 施工单位应协助建设单位, 设计单位, 完善设计图纸, 特别是防排烟正压送风, 事故电源切换, 应急广播, 电梯迫降, 防火分区的划分等部分设计是否满足, 高规、建规 及相关消防设计规范 抓住了基础工作, 把握了关键, 才能保证整个工程中防灾系统施工顺利, 达到一次调试成功验收通过。
(3) 工程质量关系到防火灭火的成败, 因此消防工程施工必須严格按照消防设计、 施工和验收规范进行施工。 事实证明, 如果忽略了安装方面的质量要求, 往往导致验收虽然通过了, 但系统运行不可靠, 甚至发生强行进入系统烧毁设备的严重事故, 这也是缺少整合能力的表现。
实践证明, 建筑消防安装工程中出现的工程质量问题, 主要
是由于施工单位只过重注重经济效益, 对消防安装规范学习和设
施的监测缺少足够的认识和投入所造成的, 只有及时跟踪建筑消
防施工过程, 坚决杜绝违反消防技术规范施工的现象出现, 才能
确保建筑消防安装工程质量。建筑消防的正常生产运行和使用是安全生产的重要保证, 只有规范工程施工作业, 严格按照各项规程施工, 才能确保消防安装工程质量, 保证消防设施在关键时期发挥关键作用。
4、验收的程序
消防验收的目的是,检查工程竣工后其消防设施配置,是否符合已获审核批准的消防设计的要求。 验收的组织主持者是公安消防机构, 验收的申报者是工程的建设单位 。验收的结果是判定工程是否可以投入使用或生产。 或者需要进行必要的整改 ,验收的顺序通常为验收受理。现场检查, 现场验收。
评定和工程移交等阶段,验收阶段应注意的问题,消防验收是综合性强 ,须各个专业都达到验收条件,方可进行, 因此消防验收是一项复杂而细致的工作, 土建专业、防火门、 防火卷帘必须安装就位 ,消防道路必须铺设完成 ,安装专业须通过建筑物的消防电气检测 应急灯符合消防要求,照明与动力电切换正常, 消防专业须通过自动消防设施检测。
室外消火栓,、水泵接合器也必须安装就位, 但建筑物竣工时外网工程,往往会相对的滞后或正处于施工阶段, 若要保证验收的顺利进行, 自来水外网工程应及时完成 ,以满足消防验收时的用水需要, 保证室外消火栓的安装就位, 同时室外水泵接合器的安装也要保证在验收前完成, 且做好要的成品保护工作 ,避免其他管线施工造成破坏。
5、结语
施工企业应将, 以人为本、 安全第一作为理念, 严格按照国
家规范和现行标准及有关规定施工,保证消防设施的正常使用。
参考文献:
[ 1] 马致远,张磊.浅谈高层建筑消防电气设计中的几个问题
[ J] . 山西建筑, 2007, 33( 24) : 194 - 195.
注:文章内所有公式及图表请用PDF形式查看。
关键词:消防安装, 试验,施工验收
Abstract: the construction of fire control facilities is an essential building construction and installation. Along with the development of construction industry, the degree of fire safety, reliability put forward higher request. The quality of the construction quality, the direct impact on the normal operation of the facilities of the fire. From daily construction quality supervision and inspection and acceptance of work situation, the construction process still has some problems, and combined with engineering specific installation construction process the actual situation, the construction process of building fire installation some problems in the analysis, and put forward the corresponding technical measures to solve the problems in the process of installation of trival, improving engineering installation quality, ensure security.
Keywords: fire installation, test, construction inspection
中图分类号:TU74文献标识码:A 文章编号:
1、消防安装
随着我国消防法的不断深入贯彻, 我国建筑市场的竞争规则 、技术标准 、经营方式 ,服务模式都将进一步与国际接轨, 在建筑市场的影响下, 现代化的厂房对安全功能, 尤其是消防设施的安装工程质量要求也越来越高, 但现实是消防设施尤其是消防管道的安装是在土建等主体工程完成后方可进行, 而此时电气安装工程 ,设备安装工程也在抢工期, 当消防管道安装与其他安装工程发生冲突时, 必会为其他抢工期 保生产的工程让路, 这就给消防安装质量带来了隐患。
2、安装及实验
下面就建筑消防安装施工过程中所产生的若干问题进行了分析,建设部颁发的自动喷水灭火系统施工及验收规范中规定:管网安, 当管子公称直径小于或等于100 mm 时, 应采用螺纹连接, 当管子公称直径大于 100 mm 时, 可采用焊接或法兰连接通过多年实践, 对标准进行了修定, 于2005 年5 月16 日颁发了GB50261- 2005 自动喷水灭火系统施工及验收规范确定于2005 年7 月1 日实施, 在规范第5. 1. 2 条指出应采用螺纹沟槽式管件或法兰连接, 因为从工程实践证明, 消防管道焊接的接口处容易发生锈蚀, 产生的氧化铁脱落后极易堵塞管道和喷头, 影响系统的正常使用。 管道采用螺纹沟槽式管件或法兰连接安装简便, 工期短, 并且能确保工程质量, 同时在使用过程中的维修管理也带来方便。 但由于多年来, 工程人员已习惯了而且焊接工艺施工简单, 初期造价低, 从而造成工程施工中极易出现消防管道焊接现象, 消防工程是百年大计, 因此要从设计消防管道的焊接工艺,质检、 消防验收等多方位加强管理, 确保从根本上杜绝消防管道的焊接现象在消防供水设施安装中也存在着一些问题。 在 GB 50261-2005 自动喷水灭火系统施工及验收规范中,第 4 章规定消防水泵的出水管上应安装止回阀 ,控制阀和压力表, 系统的总出水管上还应安装压力表和泄压阀; 安装压力表时应加缓冲装置 压力表和缓冲装置之间应安装旋塞、 消防水池 、消防水箱的溢流管, 泄水管不得与生产或生活用水的排水系统直接相连, 应采用间接排水方式, 而在施工时经常忽视消防用水与其他用水合并的水箱不能作为他用的技术设施, 以及不设置止回阀 ,不设置缓冲装置不按规范要求保证消防水箱应储存10 min 的消防用量, 导致无法确保消防系统的正常使用。
3、质量管理
在 GB 50261- 2005 自动喷水灭火系统施工及验收规范中第6 章强制性条文规定, 管网安装完毕后, 应对其进行强度试验严密性试验和冲洗 ,即管网试压分强度和严密性两步进行, 当系统设计工作压力等于或小于1. 0 MPa 时, 水压强度试验压力应为设计工作压力的1. 5 倍, 并不低于1. 4 MPa; 当系统设计工作压力大于 1. 0 MPa 时, 水压强度试验压力应为该工作压力加0. 4 MPa 水压严密性试验应在水压强度试验和管网冲洗合格后进行, 试验压力为设计工作压力。 目前, 有些工地为抢工期, 只对管网进行水压严密性试验或者强度试验压力也不符合设计和范要求, 这就给系统的正常生产运行带来了隐患。如果消防工程专业施工企业的主要技术负责人或现场施工负规责人员,对整个工程防灾系统逻辑功能不具备全面清楚的理解把握, 而土建总包方技术负责人又不清楚这些消防安装工程, 往往造成工程最后阶段迟迟调试不完, 甚至验收不合格的被动局面有鉴于此, 施工企业应当从多方面加强消防工程的施工质量管理:
(1) 要对工程中使用的消防产品和辅助产品 材料进行复核查验, 做好记录, 不合格的决不能使用 切实做到正确的符合规范要求的安装施工。
(2) 施工单位应协助建设单位, 设计单位, 完善设计图纸, 特别是防排烟正压送风, 事故电源切换, 应急广播, 电梯迫降, 防火分区的划分等部分设计是否满足, 高规、建规 及相关消防设计规范 抓住了基础工作, 把握了关键, 才能保证整个工程中防灾系统施工顺利, 达到一次调试成功验收通过。
(3) 工程质量关系到防火灭火的成败, 因此消防工程施工必須严格按照消防设计、 施工和验收规范进行施工。 事实证明, 如果忽略了安装方面的质量要求, 往往导致验收虽然通过了, 但系统运行不可靠, 甚至发生强行进入系统烧毁设备的严重事故, 这也是缺少整合能力的表现。
实践证明, 建筑消防安装工程中出现的工程质量问题, 主要
是由于施工单位只过重注重经济效益, 对消防安装规范学习和设
施的监测缺少足够的认识和投入所造成的, 只有及时跟踪建筑消
防施工过程, 坚决杜绝违反消防技术规范施工的现象出现, 才能
确保建筑消防安装工程质量。建筑消防的正常生产运行和使用是安全生产的重要保证, 只有规范工程施工作业, 严格按照各项规程施工, 才能确保消防安装工程质量, 保证消防设施在关键时期发挥关键作用。
4、验收的程序
消防验收的目的是,检查工程竣工后其消防设施配置,是否符合已获审核批准的消防设计的要求。 验收的组织主持者是公安消防机构, 验收的申报者是工程的建设单位 。验收的结果是判定工程是否可以投入使用或生产。 或者需要进行必要的整改 ,验收的顺序通常为验收受理。现场检查, 现场验收。
评定和工程移交等阶段,验收阶段应注意的问题,消防验收是综合性强 ,须各个专业都达到验收条件,方可进行, 因此消防验收是一项复杂而细致的工作, 土建专业、防火门、 防火卷帘必须安装就位 ,消防道路必须铺设完成 ,安装专业须通过建筑物的消防电气检测 应急灯符合消防要求,照明与动力电切换正常, 消防专业须通过自动消防设施检测。
室外消火栓,、水泵接合器也必须安装就位, 但建筑物竣工时外网工程,往往会相对的滞后或正处于施工阶段, 若要保证验收的顺利进行, 自来水外网工程应及时完成 ,以满足消防验收时的用水需要, 保证室外消火栓的安装就位, 同时室外水泵接合器的安装也要保证在验收前完成, 且做好要的成品保护工作 ,避免其他管线施工造成破坏。
5、结语
施工企业应将, 以人为本、 安全第一作为理念, 严格按照国
家规范和现行标准及有关规定施工,保证消防设施的正常使用。