摘要:市政给水系统是市政工程设施得以正常使用的重要设施之一,虽然施工工艺相对不太复杂,但其施工要求难度较大。大多数施工队伍技术力量薄,施工经历不多,尤其对大口径管道,质量控制难度更大。本文结合城市给水工程发展特点,从质量角度提出了相应的管理措施。
关键词:市政给水工程;管道施工;管理
Abstract: Municipal water supply system is one of important facilities in normal use of the municipal engineering facilities, although construction process is relatively not too complex, but its construction requirements are difficult. Most of the construction team of technical strength of thin, construction experience is not much, especially for large diameter pipeline, quality control is more difficult. This paper combines the characteristics of the development of city water supply engineering, puts forward the corresponding management measures from the angle of quality.
Keywords: municipal water supply pipeline construction; management;
中圖分类号:TU99
1市政给水工程发展的特点
1.1长距离引水工程越来越多。由于城市近区水源的水量或水质已不能满足供水的需求,只有跨地区跨流域寻找水源,造成长距离引水工程越来越多。
1.2水厂净化工艺越来越复杂。由于经济和技术的原因,使水环境污染越来越严重。加之随着人们生活水平的提高,对自来水水质的要求越来越高。这样就导致了水厂净化工艺将越来越复杂,处理流程越来越长。
1.3利用外资建设的项目越来越多。据资料统计,全国引进外资建设的给水工程项目,已列入国家计划的共129项,规模2811×104(m3/d,总投资287.7亿元人民币,引用外资额为16.57亿美元。
1.4给水增压技术设施越来越新。随着城市内高层建筑的发展,一些新型的加压和流量调节装置,例如气压给水装置、变频调速供水设备等正在逐步替代高位水箱或水塔。
1.5水厂自动化程度越来越高并趋普及。近年来,供水行业特别在新建水厂中已大量采用先进的仪器仪表、自动化装置、各种新型专用器材与设备等。水厂运行的调度管理以及生产过程的监控系统和自动化技术,已在大中型水厂广泛采用,小型水厂也已逐步推广。同时,还开展了管网和生产管理上优化调度的研究。
1.6分质供水与广域供水系统越来越多。一些经济发达地区或水源受到较多污染的城市,已开始兴建区域性双给水(饮用与使用)系统的试点工程。某些城市也已经被建设部列为推行分质供水(生活、生产杂用)的试点城市。广域供水系统即一个水源工程供应几个城市使用。
1.7避成蓄淡的河口水库逐渐增多。在沿海地区为充分利用淡
水资源,采用在河流入海口处修建水库,以利用潮汐的间隙,伺机取
蓄淡水供城市使用,如杭州的珊瑚沙水库等。
2施工准备计划工作
2.1原材料的选用:①水泥、木材:钢材水泥是该工程重点控制的建筑材料,合作建材供应单位能及时提供工程所需,工程所在地也有一定建筑材料市场,可作为应急后备;②预制砼块:在现场制作。物资部门根据产品(材料)的特性组织运输、贮存和防护工作,防止产品损坏或变质,并妥善保护产品的标识,对入库的产品(材料),保管人员定期检验库存产品的质量情况,如发现变质或已过保质期的应及时处理,防止混入工程中使用。生产部门按需要做出领用计划,报工程技术部校核后,由总工审核后,物资部门发放。
2.2砼、砂浆试验工程施工前需做现场试验,以确定半成品的物理力学性能指标,确定最佳旌工参数、施工工艺,提供质量控制指标及检验控制办法。根据试验记录,整理出试验成果报告,报工程师审批,按批复意见实施。砼及砂浆配合比试验,按呈报工程师批准的原材料,并按《规范)规定和设计强度,在室内作不同品种水泥、不同外加剂掺量与砼的抗压强度关系,砂率选择、用水量与坍落度关系等一系列试验,从中分析挑选出最优的配合比,写成书面试验报告,呈送工程师批准,作为砼及砂浆试制的依据。
2.3基线复核及测量放线。根据提供的测量控制点及精度要求,在动工前应复核资料和数据的准确性。管道的起点、终点及转折点是管道施工的重点,管道中线定位就是将主点位置测设到地面上去,并用本桩标定。
3施工管理措施
3.1施工进度工期保证措施:①由项目经理组建项目部并组织各施工班组配备相应的施工技术人员。②根据项目组建的人力,设备计划,合理安排施工工序和各工序的作业时间,并充分考虑雨季施工天气的影响。③每工序必须在计划时间内完成,如果一个工序作业时间超出计划时间,在下一工序补上,可适当延长工作时间,总工期不得超过发包方要求的工期。④施工按照流水作业进行每工序前应做好施工准备。通过工序的合理安排和及时调整,在质量,技术,组织等措施的促进下,合理配置人,机,财,物等要素。高效合理地安排工程进度,科学运作,保证在建设单位的要求和需求时间内全面,优质地完成工程。
3.2质量保证措施:①确定各责任人员,明确取责范围,专人负责,定点检查,特别是对工程的关键工序及部位,要严格把关,确保工程质量牌控制状态。质保人员要进入施工现场。②严格执行质量否决制度,实行自检、专检、联检“三检”相结合的质检制度,不合格工序,不能进行下一道工序,必须解决不合格后,经质检人员认可后方可进行下一道工序。③严格执行证上岗制度,对主要工种和工序安装应做出标记,作好施工记录。④做好施工技术交底工作,三级交底制度,项目技术负责人的施工工长进行技术交底,施工工长向施工班组长进行交底,施工班组长在工序施工前应向具体操作人员进行技术交底,且应有书面交底资料,口头交底应作好记录。
3、3安全保证措施:①项目经理是施工项目安全管理第一责任人。项目部安全负责人负责该工程的安全管理工作。工地设安全员,负责整个工地的安全工作,查安全隐患,定安全措施,进行安全防护。发现安全隐患及时上报处理。②由安全员组织施工人员学习《安全技术操作规程》,增强工人的安全意识。③安检部对工程的安全工作定期进行检查,要查思想,查制度、查现场、查隐患、查事故处理等。④施工作业人员要遵守建设单位和施工单位的安全规章制度和《安全操作规程》。
3.4技术管理措施:①工程的技术负责人负责技术管理工作。②工程的技术员深入施工现场,检查各施工工艺、施工技术措施及施工进度计划的落实情况。③施工前组织所有施工人员进行技术交底。④严格执行规范,标准等规章制度。
4结论
给水管道施工是市政施工过程中的一个重要环节,因此在施工阶段的全过程必须严格按照每一道工序的要求,加强每一环节的质量控制,才能防止各种质量通病的发生,确保整体工程施工质量达到优良,从而实现创优目标。
关键词:市政给水工程;管道施工;管理
Abstract: Municipal water supply system is one of important facilities in normal use of the municipal engineering facilities, although construction process is relatively not too complex, but its construction requirements are difficult. Most of the construction team of technical strength of thin, construction experience is not much, especially for large diameter pipeline, quality control is more difficult. This paper combines the characteristics of the development of city water supply engineering, puts forward the corresponding management measures from the angle of quality.
Keywords: municipal water supply pipeline construction; management;
中圖分类号:TU99
1市政给水工程发展的特点
1.1长距离引水工程越来越多。由于城市近区水源的水量或水质已不能满足供水的需求,只有跨地区跨流域寻找水源,造成长距离引水工程越来越多。
1.2水厂净化工艺越来越复杂。由于经济和技术的原因,使水环境污染越来越严重。加之随着人们生活水平的提高,对自来水水质的要求越来越高。这样就导致了水厂净化工艺将越来越复杂,处理流程越来越长。
1.3利用外资建设的项目越来越多。据资料统计,全国引进外资建设的给水工程项目,已列入国家计划的共129项,规模2811×104(m3/d,总投资287.7亿元人民币,引用外资额为16.57亿美元。
1.4给水增压技术设施越来越新。随着城市内高层建筑的发展,一些新型的加压和流量调节装置,例如气压给水装置、变频调速供水设备等正在逐步替代高位水箱或水塔。
1.5水厂自动化程度越来越高并趋普及。近年来,供水行业特别在新建水厂中已大量采用先进的仪器仪表、自动化装置、各种新型专用器材与设备等。水厂运行的调度管理以及生产过程的监控系统和自动化技术,已在大中型水厂广泛采用,小型水厂也已逐步推广。同时,还开展了管网和生产管理上优化调度的研究。
1.6分质供水与广域供水系统越来越多。一些经济发达地区或水源受到较多污染的城市,已开始兴建区域性双给水(饮用与使用)系统的试点工程。某些城市也已经被建设部列为推行分质供水(生活、生产杂用)的试点城市。广域供水系统即一个水源工程供应几个城市使用。
1.7避成蓄淡的河口水库逐渐增多。在沿海地区为充分利用淡
水资源,采用在河流入海口处修建水库,以利用潮汐的间隙,伺机取
蓄淡水供城市使用,如杭州的珊瑚沙水库等。
2施工准备计划工作
2.1原材料的选用:①水泥、木材:钢材水泥是该工程重点控制的建筑材料,合作建材供应单位能及时提供工程所需,工程所在地也有一定建筑材料市场,可作为应急后备;②预制砼块:在现场制作。物资部门根据产品(材料)的特性组织运输、贮存和防护工作,防止产品损坏或变质,并妥善保护产品的标识,对入库的产品(材料),保管人员定期检验库存产品的质量情况,如发现变质或已过保质期的应及时处理,防止混入工程中使用。生产部门按需要做出领用计划,报工程技术部校核后,由总工审核后,物资部门发放。
2.2砼、砂浆试验工程施工前需做现场试验,以确定半成品的物理力学性能指标,确定最佳旌工参数、施工工艺,提供质量控制指标及检验控制办法。根据试验记录,整理出试验成果报告,报工程师审批,按批复意见实施。砼及砂浆配合比试验,按呈报工程师批准的原材料,并按《规范)规定和设计强度,在室内作不同品种水泥、不同外加剂掺量与砼的抗压强度关系,砂率选择、用水量与坍落度关系等一系列试验,从中分析挑选出最优的配合比,写成书面试验报告,呈送工程师批准,作为砼及砂浆试制的依据。
2.3基线复核及测量放线。根据提供的测量控制点及精度要求,在动工前应复核资料和数据的准确性。管道的起点、终点及转折点是管道施工的重点,管道中线定位就是将主点位置测设到地面上去,并用本桩标定。
3施工管理措施
3.1施工进度工期保证措施:①由项目经理组建项目部并组织各施工班组配备相应的施工技术人员。②根据项目组建的人力,设备计划,合理安排施工工序和各工序的作业时间,并充分考虑雨季施工天气的影响。③每工序必须在计划时间内完成,如果一个工序作业时间超出计划时间,在下一工序补上,可适当延长工作时间,总工期不得超过发包方要求的工期。④施工按照流水作业进行每工序前应做好施工准备。通过工序的合理安排和及时调整,在质量,技术,组织等措施的促进下,合理配置人,机,财,物等要素。高效合理地安排工程进度,科学运作,保证在建设单位的要求和需求时间内全面,优质地完成工程。
3.2质量保证措施:①确定各责任人员,明确取责范围,专人负责,定点检查,特别是对工程的关键工序及部位,要严格把关,确保工程质量牌控制状态。质保人员要进入施工现场。②严格执行质量否决制度,实行自检、专检、联检“三检”相结合的质检制度,不合格工序,不能进行下一道工序,必须解决不合格后,经质检人员认可后方可进行下一道工序。③严格执行证上岗制度,对主要工种和工序安装应做出标记,作好施工记录。④做好施工技术交底工作,三级交底制度,项目技术负责人的施工工长进行技术交底,施工工长向施工班组长进行交底,施工班组长在工序施工前应向具体操作人员进行技术交底,且应有书面交底资料,口头交底应作好记录。
3、3安全保证措施:①项目经理是施工项目安全管理第一责任人。项目部安全负责人负责该工程的安全管理工作。工地设安全员,负责整个工地的安全工作,查安全隐患,定安全措施,进行安全防护。发现安全隐患及时上报处理。②由安全员组织施工人员学习《安全技术操作规程》,增强工人的安全意识。③安检部对工程的安全工作定期进行检查,要查思想,查制度、查现场、查隐患、查事故处理等。④施工作业人员要遵守建设单位和施工单位的安全规章制度和《安全操作规程》。
3.4技术管理措施:①工程的技术负责人负责技术管理工作。②工程的技术员深入施工现场,检查各施工工艺、施工技术措施及施工进度计划的落实情况。③施工前组织所有施工人员进行技术交底。④严格执行规范,标准等规章制度。
4结论
给水管道施工是市政施工过程中的一个重要环节,因此在施工阶段的全过程必须严格按照每一道工序的要求,加强每一环节的质量控制,才能防止各种质量通病的发生,确保整体工程施工质量达到优良,从而实现创优目标。