论文部分内容阅读
通过实地考察 ,分析了金源泥石流形成背景 ,对泥石流防治工程设计必需的水文参数进行了讨论 ,介绍了治理方案的选择和确定 ,重点讨论了 1 0 0 0m长排导糟工程的设计。
Through the field investigation, the background of gold source debris flow formation was analyzed. The hydrological parameters necessary for debris flow prevention and control engineering design were discussed. The selection and determination of the treatment scheme were introduced. The design of the 10 000 m long guideways was mainly discussed.