三峡工程三期上游RCC围堰拆除采用“中段380 m倾倒爆破与两端深孔爆破相结合”的方案。介绍了该方案爆破参数及起爆网路的设计、施工情况及爆破效果。
The third phase of the Three Gorges Project RCC cofferdam removal using “mid-380 m dumping blasting and deep-hole blasting at both ends of the program” program. The blasting parameters and the design and construction of blasting network and the blasting effect are introduced.