论文部分内容阅读
秦山核电公司(QNPC)300MWe核电厂蒸汽发生器(SG)第4次停堆换料期间进行了视频检查和水力冲洗。受秦山核电公司委托对300MWe核电厂SG二次侧化学清洗进行工程验证,为下一次停堆换料期间实施SG二次侧化学清洗作技术准备。在水力冲洗系统上取到QNP
QNPC’s 300MWe Nuclear Power Plant steam generator (SG) conducted a video inspection and hydraulic flushing during the fourth shutdown refueling. Entrusted by Qinshan Nuclear Power Company to carry out project verification of secondary side chemical cleaning of SG in 300MWe nuclear power plant and make technical preparations for secondary side chemical cleaning of SG during the next shutdown and refueling. Take QNP on the hydraulic flush system