高速公路机电工程一般是指收费、通信和监控系统,如有隧道则还包括隧道的通风、照明和监控系统。近年来,随着我国利用国际贷款建设高速公路项目的增加,如何搞好高速公路机电工程招标工作变得日益重要,尤其是世界银行贷款的项目。因为世行对于高速公路机电工程的国际招标有很严格的招标程序,在招标过程中,工作如不严谨,就可能会造成招标周期的延长,更严重的可能会重新招标,使业主及投标人蒙受经济损失。我认为在招标的不同阶段应有其各自重点注意的地方,下面主要以世行机电工程项目为例从业主进行项目管理的角度分析如下:
Expressway electromechanical engineering generally refers to toll collection, communication and monitoring systems. If there are tunnels, it also includes tunnel ventilation, lighting and monitoring systems. In recent years, with the increase in the use of international loans for the construction of expressway projects in China, it has become increasingly important how to do a good job in the tendering of highway electrical and mechanical projects, especially the World Bank loan project. Because the Bank has very strict tendering procedures for the international tendering of expressway electromechanical engineering, in the bidding process, if the work is not rigorous, it may cause an extension of the tender period, and more serious may be re-tendering to the owners and bidders. Suffered economic losses. I think that at different stages of the tendering process, there should be their respective areas of focus. The following is the main analysis of the World Bank’s mechanical and electrical engineering projects from the perspective of the project management of the owners: