央瓦力克水库为引水注入式平原水库,引渭干河河水,经过克孜尔水库—东方红电站—库沙新总干渠—沙新总干渠—沙雅总干渠5号闸—羊达克夏干渠(桩号:1+537)—央瓦力克水库引水渠—央瓦力克水库。现状央瓦力克水库由水库大坝、水库引水渠、放水涵洞及放水渠组成,本次除险加固主要对水库大坝、放水涵洞和水库引水渠进行除险加固。文章主要是对央瓦力克水库除险加固工程中防渗材料、坝基防渗型式进行优化设计的探讨,提出了可操作措施。
The Yang Wa Lectra Reservoir is a water diversion injection plain reservoir that leads the Weigan River through the Kizil Reservoir - Dongfanghong Power Station - the new Kusha main canal - the new main Shahe - the Shaya main trunk gate No. 5 - Main Canal (Stake # 1 + 537) - Yang Wa Lectra Reservoir Drainage - Yang Wa Lectra Reservoir. The status quo The Central Walleke Reservoir is composed of a reservoir dam, a reservoir diversion canal, a drainage culvert and a drainage channel. The project mainly reinforces the reservoir dams, drainage culverts and reservoir diversion channels. The article mainly discusses the optimization design of anti-seepage material and dam seepage proofing type in the project of eliminating danger and reinforcement in the central Walaike Reservoir and puts forward feasible measures.