逊克县黑龙江堤防大部分是在原堤的基础上进行加高培厚,以达到防洪设计标准。由于利用原堤进行加高培厚,给施工带来一些技术难题,如:怎样搞好原堤坡面上的杂草、腐植土料的清除,是否满足施工技术要求,达到新旧上科结合,保持深处的坝体稳定,确保大堤安全渡汛。通过几年
Most of the embankments in Xunke County of Heilongjiang Province are built on the basis of the original embankment to raise the thickness of the embankment in order to achieve flood control design standards. As the use of the original dike thickened, to bring some technical problems to the construction, such as: how to do a good job on the original slope of the weeds on the slope, the removal of humus soil material, whether to meet the technical requirements of construction, to achieve the combination of old and new, keep deep Department of dam stability, to ensure the safety of flood protection dike. Through a few years