论文部分内容阅读
本文介绍了处于高温环境中的元江大桥3#墩承台大体积混凝土施工中的温控技术 ,并对温度监测结果进行分析 ,可供类似工程借鉴。
This paper introduces the temperature control technology in the mass concrete construction of No.3 pier pier of Yuanjiang Bridge in high temperature environment and analyzes the temperature monitoring results for reference of similar projects.