论文部分内容阅读
在这帅旗飄飄,战鼓冬冬的大跃进的时代里,甘肃省地質局水文地質工程地質大队也出現比去年更大的跃进局面。虽然今年的工作地区更分散,东西长达1700余公里,有兩个綜合分队由西向东都做了近千里的大搬迁,在技术力量上也由于上調和外調显得比过去薄弱了,这些都增加了工作中的困难。但是在总路綫的光辉照耀下,我們坚决貫彻了上級党委和地質局所指示的,要“眼睛向下,自力更生,依靠群众,内外协作”,基本上克服了技术力量不足,物資、油料缺乏,修配不及时等困难。比去年提前25天出队,完成了比去年第一季度高5倍的工作量。他們所以能克服以上困难,获得显著成績,有以下几点体会。
In this handsome flag fluttering, the drum of the Great Leap Forward winter era, Gansu Provincial Bureau of Geology hydrogeological engineering geological brigade also appeared more than last year’s leap forward situation. Although this year’s work area is more scattered, with 1,700 kilometers of east-west things, two integrated detachments have made a nearly thousand-mile relocation from west to east, and their technical strength has also been weaker than in the past due to the upward adjustment and the outward adjustment. Increased work difficulties. However, under the shining rays of the general line, we have resolutely implemented the instructions from the higher party committees and the Bureau of Geology to “lower our eyes, rely on ourselves and rely on the masses and work together internally and externally” to basically overcome the problems of lack of technical strength, lack of materials and materials, Repair is not timely and other difficulties. 25 days earlier than last year, de-team completed more than 5 times the first quarter of last year’s workload. As a result, they have been able to overcome the above difficulties and achieve remarkable results. They have the following experiences.