论文部分内容阅读
一、调试准备工作(1)设备检查:设备连接牢固,水泵试运转正常。(2)管路检查:关闭系统的排空阀门,打开循环系统的阀门。(3)电气检查:设备、管线绝缘电阻合格,电控柜空载试验,各电气元件动作正常。(4)检查过滤器的开启状态,将其置于过滤位置。(5)配置pH调整剂:在pH调整剂药桶内配置3%的稀盐酸或小苏打水溶液。具体选用何种药剂,需根据池水pH值的变化情况确定。(6)消毒剂的配置:在消毒剂药桶内
First, the preparation for commissioning (1) equipment inspection: Equipment connected firmly, the pump test run properly. (2) pipeline inspection: close the system emptying valve, open the circulatory system valve. (3) electrical inspection: equipment, pipeline insulation resistance qualified, empty control cabinet test, the normal operation of the electrical components. (4) Check the filter is turned on, put it in the filter position. (5) Configure pH adjusting agent: dispose 3% dilute hydrochloric acid or sodium bicarbonate solution in the pH adjusting agent medicine barrel. The specific choice of which agents, according to changes in the pH of the water to determine. (6) disinfectant configuration: in the disinfectant medicine barrel