论文部分内容阅读
防腐质量存在问题的管线埋在地下,如同一颗定时炸弹。张福录查的是质量,抓得却是作风。1973年9月,大庆至铁岭输油管道复线工程开工,东北“八三”工程指挥部副指挥张福录到一线检查施工质量。一天,他在设在嫩江边的工程三处防腐厂看到,做好防腐层的钢管像小山一样码放在场地上,十分整齐;钢管外层的白色塑料布缠绕得十分光滑,阳光下闪耀着银光。
A pipeline of problems with preservative quality buried in the ground, like a time bomb. Zhang Fu recorded the quality of the investigation, but it is the style. In 1973 September, Daqing to Tieling pipeline double-track project started, northeast “83” Zhang Fulu, deputy commander of engineering command to the front line inspection of construction quality. One day he saw at the three anti-corrosion plants in the project located on the Nenjiang River that the steel pipe with the anti-corrosion layer was placed on the ground like a hill and was very neat. The white plastic sheeting on the outer layer of the steel pipe was very smooth and the silver shining in the sun shone with silver Light.