小浪底工程进水塔属于世界上最复杂的进水口 ,共布置了 98个闸门。闸门槽二期混凝土施工具有施工空间狭窄、悬空高度较大、施工部位分散、施工干扰大、工期要求紧等特点 ,这在以往的水电施工中是不曾有的。在施工过程中 ,通过采用新型施工工艺和先进的施工设备 ,成功的解决了所遇到的难题 ,顺利完成了二期混凝土施工
Xiaolangdi project inlet tower is the world’s most complex inlet, a total of 98 gate layout. Sluice gate construction of the second phase of concrete has the construction of space is narrow, the greater the height of the vacant, scattered construction site, construction interference, tight schedule requirements and other characteristics, which in previous hydropower construction is not there. In the construction process, through the use of new construction techniques and advanced construction equipment, successfully solved the problems encountered, the successful completion of the second phase of concrete construction