双曲线冷却塔施工方法的改进

来源 :工业建筑 | 被引量 : 0次 | 上传用户:liongliong446
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
河南省建七公司承建的安阳电厂2号双曲线型自然通风冷却塔,淋水面积3500米~2,总高度90米,上口刚性环梁直径42.62米,下口环梁直径67.886米,支承风筒的人字柱40对,它既是冷却塔的主要承重构件,又是进风口。为解决环梁底模与施工用脚手问题,在施工中作了以下几点改进。1.将原设计的现浇人字柱改为现场预制的V型柱,配制6套钢木模板周转使用,节约木材131米~3。 Anyang No. 2 hyperbolic natural draft cooling tower constructed by Henan No. 7 Company, with an area of ​​3,500m~2, a total height of 90m, an upper ring diameter of 42.62m, and a lower ring beam diameter of 67.886m. The wind pipe has 40 pairs of columns, which are both the main load-bearing components of the cooling tower and the air inlet. In order to solve the problem of the ring beam bottom mold and the construction of the foot, the following improvements were made in the construction. 1. The original designed cast-in-place pylons were changed to prefabricated V-pillars, and 6 sets of steel-wood formworks were used for turnover, saving 131m~3 wood.
其他文献
1.制定复习计划,严格落实制定复习计划,目的在于复习时克服盲目性,防止头痛顾头,脚痛顾脚,打乱仗的毛病,从而增强针对性,在有限的时间内做到紧张有序,求得最佳复习效果。制定
继今年全国建筑电气设计节能经验交流会和全国共用天线电视系统应用技术设计专题交流会以来,八月中旬由广东省建筑设计院、广州市建筑设计院、广东省建筑学会联合主办的《广
今年八月底由城市能源专业委员会三北地区(东北、华北、西北)联络中心在天津市召开三北地区城市供热会议.会议中心议题是讨论城市供热规划及一些供热的共性问题如:加强组织
为了进一步探索城市集中供热在介质参数与使用燃料等方面的发展方问,并商讨中、法两国在此颌域内的合作前景,7月21日至23日,在沪召开中、法两国城市集中供热技术交流会。中
随着社会信息化的普及,学生获取知识的渠道宽广了,教师对于教材的使用应该把它作为课程资源,根据自身的实际情况创造性地使用教材,用出个性风格和特点,不能生搬硬套。特别是
ZS-Z型空调制冷系统自控装置,由上海工业建筑设计院设计,金山电子净化工业公司试制,于1981年1月17日通过鉴定,各项指标达到设计要求。该装置能够满足多种类型空调制冷系统(
一、利用化学实验,培养探究意识1.创设实验,培养探究意识九年级化学是学生认识化学世界的启蒙阶段,所以化学实验是培养学生兴趣和探究意识的良好入手点。如化学第一节入门课,
在桩基工程中,为了确定单桩的承载能力和检验单桩的工程质量,亟需采用一种准确、快速、简便的试桩方法。非破损检验技术是当前新兴的一门学科,它主要是利用物理场、桩基结构
山东省跋山水库灌区于1958年开发兴建,以跋山水库为主要水源,设计灌溉面积1.96万hm~2,涉及沂水县境内的7个乡镇,210个村庄。设计总干渠1条,干渠11条,支渠10条。灌区内小型水
机械工业部第二设计研究院自1973年以来承担了多项国内汽轮机行业的超速动平衡试验室工程的设计,为提高机组运行质量,做出了贡献。通过工程实践,特别在技术引进工作中。有机