论文部分内容阅读
在核电厂安全参数显示系统的设计和开发期间,执行了一套检验鉴定计划(V&V),以提高系统设计的质量。文章简要地介绍了在可行性研究、系统设计、程序开发和系统合成及调试等四个阶段执行的检验鉴定计划的工作内容。较为详细地叙述了对该系统进行的最终技术鉴定的评定计划、评定执行过程以及作出的综合鉴定结论。
During the design and development of a nuclear power plant safety parameter display system, a verification program (V & V) was implemented to improve the quality of the system design. The article briefly introduces the work of inspection and identification plan carried out in the four stages of feasibility study, system design, program development and system synthesis and debugging. Described in more detail on the system for the final technical appraisal of the assessment plan to assess the implementation process and to make a comprehensive appraisal conclusion.