根据有关规定,结合参加开发建设项目水土保持设施验收技术评估的实践与体会,针对验收阶段出现的诸如沿用2006年《开发建设项目水土流失防治标准》报批稿中的参数与计算方法,不能正确界定水保工程措施以及直接引用方案报告书措施面积、投资估算措施面积及施工合同实施面积等问题,分析其产生的原因,并着重就工程措施面积、植物措施面积、工程建构(筑)物及硬化面积、水面面积、可恢复植被面积、治理后土壤流失强度及采取措施后实际拦挡弃土(石、渣)量等指标参数的获取方法与途径进行了探讨。
According to the relevant provisions, combined with the practice and experience of the acceptance assessment of soil and water conservation facilities in development and construction projects, the parameters and calculation methods adopted in the draft for approval of soil and water loss control and development in 2006, such as those adopted in the acceptance stage, can not be correctly defined The measures for the protection of water conservancy project, the area of measures for directly quoting the report of the plan, the area of investment estimation measures and the area of the implementation of the construction contract. The reasons for this are analyzed, and the measures for the area of measures, plant measures, construction and hardening Area, surface area, recoverable vegetation area, intensity of soil erosion after the treatment and measure of actual blocking spoil (stone, slag) amount after the measures were taken were discussed.