摘要:室内改造装饰施工的管理里面也遵循着建筑施工的管理。建筑装饰技术管理的要点建筑装饰企业的技术有其特殊性,那就是既要对施工还要对设计,这两方面的技术管理负责任,又由于装饰工程项目的施工周期相对土建工程要短,所以,施工组织设计的科学性、合理性、可操作性尤为重要。因此,技术管理的控制点和有效性是衡量企业技术发展和技术进步的重要标准。下面就室内改造装饰施工方面阐述其要点。
关键字:室内改造装饰;工程;施工
Abstract: Interior renovation decoration construction management which also follow the construction management. Technical management of architectural decoration of architectural decoration enterprise technology has its particularity, it is not only to the construction but also on the design, responsible for technical management of these two aspects, the construction cycle of decoration project relative civil engineering should be short, so, the construction organization design of the scientific, reasonable, operability is important. Therefore, control point, management and effectiveness is an important standard to measure the enterprise technology development and technology progress. The following aspects of interior renovation decoration construction on its key points.
Key words: interior renovation decoration; engineering; construction;
中圖分类号: U655.59 文献标识码:A文章编号:
改造装饰工程就是对原装修全盘否定,推倒重来。室内改造装饰工程基本可分为以下几步:拆除、隐蔽工程施工、基础工程施工、常规装修。
1.拆除。门心慌拆除、墙地砖地板拆除、非承重墙拆除、水电路暖气拆除。门窗拆除的重点是安全,水路拆除要做好封闭,电路拆除要注意绝缘。
2.隐蔽工程施工。防水施工、水路改造、电路改造。
3.基础工程施工。旧房墙面基层处理、户型改造、门窗拆换、阳台保温等。
4.常规装修只要拆除和隐蔽工程做到位,其实很不容易。
一、改造装饰工程的准备事项
1.要尽量腾空住宅,给装修施工留出操作场地。
2.如果因调整室内布局的需要拆改墙体或新开门窗洞口时,一定不要拆改承重墙体,因为承重墙体关系着住宅整体结构的安全,拆除一般墙体要事先征得物业或房管部门的同意。
3.要了解住宅水电管线的铺设方向、位置和管径,对已经安装的智能系统和防范系统一定事先联系专业厂家,做好保护措施。
改造装饰工程需要处理的最大问题就是墙面和地面,只有将这两个基础改造做好,才能重塑完美框架。
二、墙面装饰施工要点
1.壁纸
在家庭装修中应用得很普遍,主要有纸造壁纸、化纤壁纸、塑料壁纸。而布质的壁纸一般称为墙布,不划归壁纸一类。壁纸可印图案,图案变化多端,色泽丰富,且施工方便快捷。
壁纸的施工,最关键的技术是防霉和处理伸缩性的问题。
(1)防霉处理。壁纸张贴前,需要先把基面处理好,可以双飞粉加熟胶粉进行批烫整平。待其干透后,再刷上一两遍清漆,然后再进行张贴。
(2)伸缩性处理。壁纸的伸缩性是一个难题,要解决就要从预防着手。一方面一定要预留0.5毫米的重叠层,有一些人片面追求美观而把这个重叠取消,这个不妥的。另外,尽量选购一些伸缩性较好的壁纸。
2.木板饰面
木板饰面是现在一些高档装修的做法。一般是在9厘底板上贴3厘饰面板,再打上蚊钉固定。木板饰面可作各种造型是其出现的最主要原因,且木饰面板具有各种天然的纹理,可给室内带来华丽的效果。
使用木板饰面需要注意的是,木板饰面做法,就如同中国画画法,一定要注意留白,把墙体用木板全部包起的想法并不理智。无论何种装修,都要保持表面的清洁,饰面板买进场后就应该刷一遍清漆作为保护层,木板饰面中,如果采用的是饰面板装饰的,技术上问题不大。
木饰面防开裂的做法有以下几种:
(1)接缝处要45度角处理,其接触处形成三角形槽面。
(2)在槽里填入原子灰腻子,并贴上补缝剂,表面调色腻子批平。
(3)再进行其他的漆层处理(刷手扫漆或者混油)。
(4)木饰面固定用的钉一定要使用蚊钉,在表层处理时,用调色腻子填平即可。
3.石材饰面
石材饰面墙面的做法,属于高档装修做法,造价高,在墙面装修中采用石材施工,主要分为两种做法:湿贴法和干挂法两种。
(1)湿贴法与瓷砖的铺设是一样的,具体施工方法请参阅下面瓷砖的施工部分。
(2)干挂法是目前在建筑业备受欢迎的做法。但由于干挂法需要占用额外的空间,对于面积较小的室内装修,较少采用。首先用镀锌膨胀螺栓安装轻钢结构。结构安装时,要做到直、平;安装挂件并安装石板,然后再在边缝处打上玻璃胶。
4.瓷砖
瓷砖是目前改造装修中的一大项目,瓷砖多应用于厨房、厕所、阳台等地方的墙、地面。瓷砖装修的最大优点就是耐脏。
瓷砖装修的主要问题是防水层的处理,因为在厨房厕所这些地方多数有用水的问题,所以墙面的防水问题不容忽视。防水层的处理办法有以下几种:
地面和墙面1米高度的宜用专业的防水剂,而墙面高于1米的位置可以选用便宜一点的沥青油做防水,如果经济不允许,也可以直接用沥青或者树脂做地面防水。地面及地面20厘米的位置一定要做厚点,改造装修时,需要在拆除旧瓷砖面后,需要先简单做水泥批烫后,仔做防水层。
瓷砖施工后,如果出现破损需要进行维修时,一定要注意,如果该位置偏低,有可能防水层在拆除时破裂,在补上新砖时,同样进行防水层修复,方可铺贴瓷砖,装修完毕后,尽量避免在低于1米高度的地方钻打孔眼。
三、地面装饰施工要点
家居地面装修的材料主要有:瓷砖、木地板、复合地板、石材和地毯。
1.瓷砖
有一些地面铲除原有铺设层是不平整的,遇到这种情况应该把不平整的地方用水泥砂浆铺平,铺设时如果地面面积较大,可以做一些拼花,也可以用不同色彩的瓷砖把周围框起来,而框内的瓷砖用比较浅颜色的。厨房跟厕所的地面一定要有倾斜度,这样是为了方便排水。
瓷砖的铺设,一定要讲究留缝,瓷砖留缝,不但是为了处理规格不整的问题,最主要的是给热胀冷缩预留位置。
瓷砖留缝,墙面以1—2毫米为好,一些小砖,为了美观,留缝反而需要大,地面留缝,除了复古砖外需要留较大的缝隙外,其他的砖一般以3—10毫米为好。检验瓷砖铺贴好坏最简单的方式就是依据两个字“平、直”。首先任选一块地方,用水平尺按對角线的方向放下,看看横跨两块对角的砖,是不是平的,然后测量每两块上下左右相邻的砖,如果是平的,水平尺中间的水珠应该在中间。最后就是看看边角是否对直。
2.木地板
素面木地板的安装一定要确保地面是平的,可以通过地面找平的方法来确定,最主要的是计算出地板铺设后是否会使大门开关不了,木地板铺设的总高度是27毫米。不平的地面,需要前期先用水泥批平。
(1)打底板。一般用优质9厘细芯板即可,也可用12厘的,9厘板按十字对等分切成四块铺设,每小块之间要有一厘米的间隙,然后用在地面钻入孔后打入木钉,再在木钉中钉入钢钉以使板和地面固定。
铺设素面原木地板。用钉打在板的四侧边上,不能把刚运入工地的地板马上用于铺设,最少需要放在工地晾三天时间。
(2)打磨地板。至少要三次,第二次以后打磨下来的木屑粉要保留下来,此种施工方法工期消耗较长,所以在工期安排时,可以提前安排。
四、施工过程中技术资料和工程质量的检查施工过程中技术资料是否齐备,工程质量是否达标,是质检部门评定质量的依辑。实施各人自检,下道工序检查上道工序,检验模式与班组长、质检员,做到及时发现问题,及时制定措施解决问题;公司品管人员进行全过程跟踪,直到不合格得到纠正,通过有效的检查和奖罚,使操作人员真正懂得了不是干了活就有工资,而是干好了才有工资,如果干不好不但得不到钱还要赔偿物料损失。使管理人员懂得不但要按期交付,质量要好,同时技术资料还要完备,否则也要受到处罚,这种机制从另一方面扭转了传统的意识和价值观,使检查达到了目的。
五、审查交付工程的竣工资料审查交付工程的竣工资料室对工程可追溯性的保证,一旦出现问题,可根据资料进行追查分析,找出原因,明确责任方或责任人,使问题能够彻底解决。另一方面也是工程决算的实际依据,是企业经营中不可缺少的环节。
结束语:建筑室内装修工程施工的质量控制涉及装修的全过程在施工中必须采取主动控制实施全方位、全过程的有效控制措施。本文从施工中的部分工序进行施工要点和施工管理的探讨,其更多的施工的管理方法还需要我们不断地探索。
参考文献:
[1]肖国全,装饰装修工程施工现场的规范化管理[J]科技资讯,,2007,(12) .
[2] 钟桂英,建筑装饰装修阶段的质量控制[J]科技资讯,2007,(15)
关键字:室内改造装饰;工程;施工
Abstract: Interior renovation decoration construction management which also follow the construction management. Technical management of architectural decoration of architectural decoration enterprise technology has its particularity, it is not only to the construction but also on the design, responsible for technical management of these two aspects, the construction cycle of decoration project relative civil engineering should be short, so, the construction organization design of the scientific, reasonable, operability is important. Therefore, control point, management and effectiveness is an important standard to measure the enterprise technology development and technology progress. The following aspects of interior renovation decoration construction on its key points.
Key words: interior renovation decoration; engineering; construction;
中圖分类号: U655.59 文献标识码:A文章编号:
改造装饰工程就是对原装修全盘否定,推倒重来。室内改造装饰工程基本可分为以下几步:拆除、隐蔽工程施工、基础工程施工、常规装修。
1.拆除。门心慌拆除、墙地砖地板拆除、非承重墙拆除、水电路暖气拆除。门窗拆除的重点是安全,水路拆除要做好封闭,电路拆除要注意绝缘。
2.隐蔽工程施工。防水施工、水路改造、电路改造。
3.基础工程施工。旧房墙面基层处理、户型改造、门窗拆换、阳台保温等。
4.常规装修只要拆除和隐蔽工程做到位,其实很不容易。
一、改造装饰工程的准备事项
1.要尽量腾空住宅,给装修施工留出操作场地。
2.如果因调整室内布局的需要拆改墙体或新开门窗洞口时,一定不要拆改承重墙体,因为承重墙体关系着住宅整体结构的安全,拆除一般墙体要事先征得物业或房管部门的同意。
3.要了解住宅水电管线的铺设方向、位置和管径,对已经安装的智能系统和防范系统一定事先联系专业厂家,做好保护措施。
改造装饰工程需要处理的最大问题就是墙面和地面,只有将这两个基础改造做好,才能重塑完美框架。
二、墙面装饰施工要点
1.壁纸
在家庭装修中应用得很普遍,主要有纸造壁纸、化纤壁纸、塑料壁纸。而布质的壁纸一般称为墙布,不划归壁纸一类。壁纸可印图案,图案变化多端,色泽丰富,且施工方便快捷。
壁纸的施工,最关键的技术是防霉和处理伸缩性的问题。
(1)防霉处理。壁纸张贴前,需要先把基面处理好,可以双飞粉加熟胶粉进行批烫整平。待其干透后,再刷上一两遍清漆,然后再进行张贴。
(2)伸缩性处理。壁纸的伸缩性是一个难题,要解决就要从预防着手。一方面一定要预留0.5毫米的重叠层,有一些人片面追求美观而把这个重叠取消,这个不妥的。另外,尽量选购一些伸缩性较好的壁纸。
2.木板饰面
木板饰面是现在一些高档装修的做法。一般是在9厘底板上贴3厘饰面板,再打上蚊钉固定。木板饰面可作各种造型是其出现的最主要原因,且木饰面板具有各种天然的纹理,可给室内带来华丽的效果。
使用木板饰面需要注意的是,木板饰面做法,就如同中国画画法,一定要注意留白,把墙体用木板全部包起的想法并不理智。无论何种装修,都要保持表面的清洁,饰面板买进场后就应该刷一遍清漆作为保护层,木板饰面中,如果采用的是饰面板装饰的,技术上问题不大。
木饰面防开裂的做法有以下几种:
(1)接缝处要45度角处理,其接触处形成三角形槽面。
(2)在槽里填入原子灰腻子,并贴上补缝剂,表面调色腻子批平。
(3)再进行其他的漆层处理(刷手扫漆或者混油)。
(4)木饰面固定用的钉一定要使用蚊钉,在表层处理时,用调色腻子填平即可。
3.石材饰面
石材饰面墙面的做法,属于高档装修做法,造价高,在墙面装修中采用石材施工,主要分为两种做法:湿贴法和干挂法两种。
(1)湿贴法与瓷砖的铺设是一样的,具体施工方法请参阅下面瓷砖的施工部分。
(2)干挂法是目前在建筑业备受欢迎的做法。但由于干挂法需要占用额外的空间,对于面积较小的室内装修,较少采用。首先用镀锌膨胀螺栓安装轻钢结构。结构安装时,要做到直、平;安装挂件并安装石板,然后再在边缝处打上玻璃胶。
4.瓷砖
瓷砖是目前改造装修中的一大项目,瓷砖多应用于厨房、厕所、阳台等地方的墙、地面。瓷砖装修的最大优点就是耐脏。
瓷砖装修的主要问题是防水层的处理,因为在厨房厕所这些地方多数有用水的问题,所以墙面的防水问题不容忽视。防水层的处理办法有以下几种:
地面和墙面1米高度的宜用专业的防水剂,而墙面高于1米的位置可以选用便宜一点的沥青油做防水,如果经济不允许,也可以直接用沥青或者树脂做地面防水。地面及地面20厘米的位置一定要做厚点,改造装修时,需要在拆除旧瓷砖面后,需要先简单做水泥批烫后,仔做防水层。
瓷砖施工后,如果出现破损需要进行维修时,一定要注意,如果该位置偏低,有可能防水层在拆除时破裂,在补上新砖时,同样进行防水层修复,方可铺贴瓷砖,装修完毕后,尽量避免在低于1米高度的地方钻打孔眼。
三、地面装饰施工要点
家居地面装修的材料主要有:瓷砖、木地板、复合地板、石材和地毯。
1.瓷砖
有一些地面铲除原有铺设层是不平整的,遇到这种情况应该把不平整的地方用水泥砂浆铺平,铺设时如果地面面积较大,可以做一些拼花,也可以用不同色彩的瓷砖把周围框起来,而框内的瓷砖用比较浅颜色的。厨房跟厕所的地面一定要有倾斜度,这样是为了方便排水。
瓷砖的铺设,一定要讲究留缝,瓷砖留缝,不但是为了处理规格不整的问题,最主要的是给热胀冷缩预留位置。
瓷砖留缝,墙面以1—2毫米为好,一些小砖,为了美观,留缝反而需要大,地面留缝,除了复古砖外需要留较大的缝隙外,其他的砖一般以3—10毫米为好。检验瓷砖铺贴好坏最简单的方式就是依据两个字“平、直”。首先任选一块地方,用水平尺按對角线的方向放下,看看横跨两块对角的砖,是不是平的,然后测量每两块上下左右相邻的砖,如果是平的,水平尺中间的水珠应该在中间。最后就是看看边角是否对直。
2.木地板
素面木地板的安装一定要确保地面是平的,可以通过地面找平的方法来确定,最主要的是计算出地板铺设后是否会使大门开关不了,木地板铺设的总高度是27毫米。不平的地面,需要前期先用水泥批平。
(1)打底板。一般用优质9厘细芯板即可,也可用12厘的,9厘板按十字对等分切成四块铺设,每小块之间要有一厘米的间隙,然后用在地面钻入孔后打入木钉,再在木钉中钉入钢钉以使板和地面固定。
铺设素面原木地板。用钉打在板的四侧边上,不能把刚运入工地的地板马上用于铺设,最少需要放在工地晾三天时间。
(2)打磨地板。至少要三次,第二次以后打磨下来的木屑粉要保留下来,此种施工方法工期消耗较长,所以在工期安排时,可以提前安排。
四、施工过程中技术资料和工程质量的检查施工过程中技术资料是否齐备,工程质量是否达标,是质检部门评定质量的依辑。实施各人自检,下道工序检查上道工序,检验模式与班组长、质检员,做到及时发现问题,及时制定措施解决问题;公司品管人员进行全过程跟踪,直到不合格得到纠正,通过有效的检查和奖罚,使操作人员真正懂得了不是干了活就有工资,而是干好了才有工资,如果干不好不但得不到钱还要赔偿物料损失。使管理人员懂得不但要按期交付,质量要好,同时技术资料还要完备,否则也要受到处罚,这种机制从另一方面扭转了传统的意识和价值观,使检查达到了目的。
五、审查交付工程的竣工资料审查交付工程的竣工资料室对工程可追溯性的保证,一旦出现问题,可根据资料进行追查分析,找出原因,明确责任方或责任人,使问题能够彻底解决。另一方面也是工程决算的实际依据,是企业经营中不可缺少的环节。
结束语:建筑室内装修工程施工的质量控制涉及装修的全过程在施工中必须采取主动控制实施全方位、全过程的有效控制措施。本文从施工中的部分工序进行施工要点和施工管理的探讨,其更多的施工的管理方法还需要我们不断地探索。