清水二井作为一个地质条件复杂且受资料的准确性影响其煤炭产量一直不理想,2005年尝试采用三维地震手段解决采区构造问题,从而达到规划采区设计的目的。经过几年的摸索该矿取得了较好的效果,采区设计精度较以往提高数倍,使得煤炭产量、回采率及采面服务年限均有较大提高,为矿井带来了较为可观的经济效益和社会效益。
As a complicated geological condition and affected by the accuracy of the data, it has been unsatisfactory to produce coal. In 2005, it tried to solve the tectonic problems of the mining area by means of 3D seismic so as to achieve the purpose of planning the mining area design. After several years of exploration, the mine has achieved good results. The design precision of the mining area has been raised several times compared with that in the past, resulting in a great increase in the coal production, recovery rate and service life of the mining face, bringing a considerable economic benefit to the mine Benefit and social benefit.