西藏尼洋河多布水电站2016年度发电量突破1亿千瓦时大关,为完成全年发电任务奠定了坚实基础。2016年以来,西藏多布水电站积极开展提质增效,立足年度发电目标,统筹安排全年电力生产工作。在枯水期及时完成机组检修消缺,全面提升设备质量,保障机组在关键时刻能够开得出、发得稳,科学合理安排机组和厂房设备运行方式,减少机组旋备损失,努力降低耗水率和厂用电率。在丰水期做好机组巡
The Nyanghe Dobu Hydropower Station in Tibet, which exceeded 100 million kwh in 2016, has laid a solid foundation for completing the annual power generation task. Since 2016, Dobu Hydropower Station of Tibet has actively carried out quality improvement and efficiency improvement, set targets for annual power generation and co-ordinated the annual power production work. In the dry season to complete the lack of maintenance units in a timely manner to improve the quality of equipment to ensure that units at a critical time can be obtained, stable development, scientific and rational arrangements for unit and plant equipment operation mode, reduce unit spin-down loss, and strive to reduce water consumption and Plant electricity rate. Do a good job in the wet season tour