论文部分内容阅读
随着水利建设多元化、多渠道、多层次投入体系的逐步形成,给水利事业的高速发展提供了契机。但是,在投入主体发生重大变革的新形势下,也出现了一些错误的认识,例如某些工程建设单位认为,投资是自己的,建设地点在本辖区,建筑物的位置、规模、结构形式、质量技术要求等可以自己定;工程承建单位认为工程实施是承建和建设单位两家的事,别人无须多管等等。结果造成不少工程质量低劣,严重干扰了水
With the diversification of water conservancy construction, the multi-channel and multi-level input system is gradually formed, which provides an opportunity for the rapid development of water conservancy. However, under the new situation of major changes in the main part of the investment, some erroneous understandings have also emerged. For example, some engineering construction units consider that the investment is their own. The construction site is located in the jurisdiction and the location, scale and structure of the building, Quality and technical requirements can be set; Engineering contractor that the project implementation is the construction and construction unit of two things, others do not have more control and so on. As a result, many projects caused poor quality and seriously disturbed the water