过渡施工中中铁一局集团电务工程有限公司本着“安全第一,预防为主,综合治理”的方针,把确保行车安全放在首位。过渡施工要根据设计文件和建设单位下达的工期和技术要求,充分考虑利用既有信号设备进行站改过渡的原则,制定合理的施工过渡方案,最大限度地减少对运营的影响及施工过渡费用,减少废弃工程。
In the transitional construction, China Railway First Bureau Group Power Engineering Co., Ltd. adhered to the principle of “safety first, prevention first, comprehensive management” and put traffic safety in the first place. Transition construction should be based on design documents and construction units issued by the duration and technical requirements, give full consideration to the use of existing signaling equipment to carry out the principle of station change, to develop a reasonable construction transition program to minimize the impact of operations and construction transition costs, Reduce the waste project.