【摘 要】通过对变形缝做法的分析,提出了施工后浇带法,根据施工后浇带的作用将其进行了分类,叙述了高层主体与低层裙房之间施工后浇带的设计与施工问题,就施工后浇带的设置、灌注混凝土的时间及施工质量作了分析。
【关键词】施工后浇带;变形缝;施工
The construction sprinkled to take after the construction problem research
Zhu Wen-hui1,E Hong-na2
(1.Shenyang Overseas construction group limited company Shenyang Liaoning 110025;
2.Liaoning Fengda house development Shenyang Liaoning 110025)
【Abstract】Pass to sprinkle to take a method towards transforming to sew way of doing of analyze, after putting forward a construction, according to construction empress sprinkle to take of the function carried on it classification, describe key figures corpus and low layer of the skirt building construction empress sprinkle to take of design and construction problem, construction empress sprinkle to take of constitution, infuse time of note the concrete and construction the quality made analysis.
【Key words】Sprinkle to take after the construction;Transform to sew;Construction
高层建筑由于功能需要,低层裙房与主楼相连并包围了高层主楼大部分。平面布局复杂,采取沿用多年的结构彻底脱开的变形缝做法已非易事,若在变形缝处出现双梁、双柱、双墙,有时为建筑所不允许,这就出现了施工后浇带法。施工后浇带按作用可分为3种:用于解决高层主体与低层裙房间差异沉降,称施工后浇沉降缝(带);用于解决钢筋混凝土收缩变形,称施工后浇收缩缝(带);用于解决混凝土温度应力,称施工后浇温度缝(带)。施工后浇带有时能起到几种变形缝的作用,但终究是临时性的变形缝,待将后浇带混凝土补齐后,达到不设永久变形缝的目的。本文叙述高层主体与低层裙房之间施工后浇带的设计与施工问题。
1. 施工后浇带设计问题
1.1 高层主楼与低层裙房的连接,是否设施工后浇带,要根据上部结构及建筑场地地基持力层情况而定。设施工后浇带有其适用条件,并非凡高层主楼与低层裙房连接处均可设施工后浇带。有的工程应设永久性沉降缝的却设施工后浇带,等于未设永久性沉降缝;有的工程可完全不设施工后浇带却设了,使设计复杂,施工困难。
1.2 施工后浇带的位置至关重要,应选在结构内力较小处。目前设计中,有要求设在梁、板跨中者;有要求设在梁、板跨1/3处者;也有只标注后浇带的大体位置,而无确切要求者。由于设计不统一,施工也较混乱,往往造成施工出现差錯,不符合设计要求。
1.3 对于基础、墙、梁、板施工后浇带的断面形式,设计图纸应有明确交代,并绘制详图。但有些设计只标注施工后浇带的位置及宽度,对后浇带的断面形式无具体要求,施工单位根据施工条件,一般做成直缝或斜缝,达不到设计要求。
1.4 施工后浇带的钢筋可断开,也可不断。如断开,为防止在同一截面钢筋焊接接头过多,则不宜直接通过一个开间。有的工程设计为施工后浇带,但施工单位却先建主楼,待高层主体完成后,再施工裙房,不留后浇缝,而是预留出钢筋,低层施工时再焊接,这虽是后浇缝的一种变通形式,但施工时未按设计要求做,易带来一些问题,如主楼及裙房板均采用冷轧扭钢筋,在裙房施工时,钢筋焊接造成困难。
2. 施工后浇带施工问题
2.1 施工后浇带的两侧宜采用钢筋支架铅丝网或单层钢板网隔断,并按规定做成企口式,但有的工程采用木模隔断做法,由于钢筋不断,木模缝隙较大;浇筑混凝土不易保证质量。对楼板的后浇带两侧,有的不支模,留成自然槎,更不易保证质量。
2.2 施工后浇带一般预留800 mm宽,钢筋应保证准确位置而连续不断,施工中由于对钢筋的保护措施不力,有些板的钢筋被踩弯或压弯,虽相对数量不多,但若不采取补救措施就浇筑混凝土,则会对板结构受力不利。如某高层建筑与裙房连接处的后浇带,现浇板由于钢筋直径小,后浇带又宽,施工中未采取保护钢筋措施,造成许多钢筋变形,不得不采取补强措施。
2.3 有些施工后浇带不完全按照设计图纸要求施工,设计要求留企口缝,实际留直槎,板的后浇带处不支模板,留成斜坡槎,虽然在浇筑混凝土前经清刷、凿毛,但不认真,疏松混凝土未彻底凿除,使混凝土补齐后连接较差。如某高层商场,裙房与高层连接处的后浇带,用不收缩混凝土补齐后个别处出现了裂缝。
2.4 施工后浇带混凝土一般应待高层主体完成后灌注,但有的高层建筑,施工中途因资金问题停建,建设单位要求将已建成部分先行装修营业;如某高层大厦,地下2层,地上19层,裙房5层,当裙房完成5层,高层完成7层时停建,建设单位要求将5层部分装修营业,何时续建不得而知,此时突出的问题是后浇带如何处理。不浇筑混凝土,不将结构连为整体不能使用;而浇筑混凝土后,高层接建时,沉降问题如何解决,给施工带来了难题。
3. 工程实践分析
3.1 高层主体建筑与低层裙房之间是否需要断开,是应设永久性变形缝,还是设临时性变形缝,或不设缝,要根据地基、基础及上部结构等具体条件区别对待。当建筑物坐在基岩层或卵石层上,或采用桩基、深墩,其沉降变形量很小,遇到这种情况高层主体与裙房基础可做成整体,不必设缝;当地基持力层压缩性高,且厚度较大,在这样的地基上,高层与裙房的差异沉降量较大,宜设永久性变形缝,使高层与裙房彻底脱开;当地基压缩性不高,沉降值差异不大,且沉降完成较快,所留施工后浇带补齐后,连成整体的结构完全可以承受剩余沉降差产生的结构内力,宜设临时性变形缝,即施工后浇带。
3.2 高层主楼与低层裙房间设缝问题,除应考虑地基及上部结构外,尚应考虑建筑平面体形。由于高层主楼的结构刚度与低层裙房的结构刚度相比,相差悬殊,若裙房在主楼一侧伸出较长,则由于建筑物结构刚度中心与质量中心偏心距较大,在地震作用下,上部结构产生扭转影响也较大。一般情况下,若裙房在主楼一侧较长,其与主楼组合起来的总长与高层主楼的长度之比超过2.5时,宜设永久变形缝,将高层与低层结构完全脱开,当然也就不存在施工后浇带的问题;当裙房与主楼总长与主楼长度之比不超过2.5时,则可考虑不设永久变形缝,而设临时变形缝,即施工后浇带,待高层主体完成后浇筑补齐,以减少高低层之间的差异沉降。
3.3 施工后浇带的位置宜选择在结构内力较小的部位,一般选在柱跨三等分的中间部位,或从梁、板的1/3跨部位通过,或从纵横墙相交的部位或门洞口的连接处通过。
3.4 施工后浇带灌注混凝土的时间,原则上应在高层主体结构完工之后,使高层先施工、先沉降,把高层与低层的差异沉降放过一部分,以减少灌注混凝土后差异沉降量。但也要根据情况区别对待,当高层主楼采用天然地基,或以摩擦为主的桩基时,由于高层沉降量较大,应待高层主体结构完成后,再浇筑后浇带;当高层主楼基础坐在卵石层或基岩上,或以端承桩为主的摩擦桩时,由于高层沉降量较小,可根据施工期间的沉降观测,确定在高层主体结构到一定高度时灌注后浇带;当遇到施工中停、缓建时,即裙房已完成,高层完成一部分,建设单位要求对已建成部分装修使用,施工后浇带必须灌注混凝土,这是事先无法预料的,设计部门要面对现实,慎重处理。一般情况下,可按高层与裙房的差异沉降变形来反算内力,这个差异沉降要按实际情况,即已建成裙房和部分高层考虑,将后浇带处的配筋予以加强。此时,因后浇带处两侧混凝土早已浇筑,增加钢筋是有难度的,但也要设法增加钢筋或钢板,使按计算增强的后浇带能够承受日后续建时,由续建的高层与裙房的差异沉降产生增大的结构内力。
参考文献
[1] 赵锡宏等.带裙房的高层建筑与地基基础共同作用设计理论与实践.上海:同济大学出版社1999.
[2] 钢筋混凝土高层建筑结构设计规范与施工规程.
[文章编号]1619-2737(2011)03-02-53
[作者简介] 朱文辉(1983.03.30-),男,籍贯:辽宁省铁岭市,职称:工程师,单位:沈阳海外建设集团有限公司。
鄂宏娜(1982.08.15-),女,籍贯:辽宁省鞍山市,职称:工程师,单位:辽宁丰大房屋开发有限公司。
【关键词】施工后浇带;变形缝;施工
The construction sprinkled to take after the construction problem research
Zhu Wen-hui1,E Hong-na2
(1.Shenyang Overseas construction group limited company Shenyang Liaoning 110025;
2.Liaoning Fengda house development Shenyang Liaoning 110025)
【Abstract】Pass to sprinkle to take a method towards transforming to sew way of doing of analyze, after putting forward a construction, according to construction empress sprinkle to take of the function carried on it classification, describe key figures corpus and low layer of the skirt building construction empress sprinkle to take of design and construction problem, construction empress sprinkle to take of constitution, infuse time of note the concrete and construction the quality made analysis.
【Key words】Sprinkle to take after the construction;Transform to sew;Construction
高层建筑由于功能需要,低层裙房与主楼相连并包围了高层主楼大部分。平面布局复杂,采取沿用多年的结构彻底脱开的变形缝做法已非易事,若在变形缝处出现双梁、双柱、双墙,有时为建筑所不允许,这就出现了施工后浇带法。施工后浇带按作用可分为3种:用于解决高层主体与低层裙房间差异沉降,称施工后浇沉降缝(带);用于解决钢筋混凝土收缩变形,称施工后浇收缩缝(带);用于解决混凝土温度应力,称施工后浇温度缝(带)。施工后浇带有时能起到几种变形缝的作用,但终究是临时性的变形缝,待将后浇带混凝土补齐后,达到不设永久变形缝的目的。本文叙述高层主体与低层裙房之间施工后浇带的设计与施工问题。
1. 施工后浇带设计问题
1.1 高层主楼与低层裙房的连接,是否设施工后浇带,要根据上部结构及建筑场地地基持力层情况而定。设施工后浇带有其适用条件,并非凡高层主楼与低层裙房连接处均可设施工后浇带。有的工程应设永久性沉降缝的却设施工后浇带,等于未设永久性沉降缝;有的工程可完全不设施工后浇带却设了,使设计复杂,施工困难。
1.2 施工后浇带的位置至关重要,应选在结构内力较小处。目前设计中,有要求设在梁、板跨中者;有要求设在梁、板跨1/3处者;也有只标注后浇带的大体位置,而无确切要求者。由于设计不统一,施工也较混乱,往往造成施工出现差錯,不符合设计要求。
1.3 对于基础、墙、梁、板施工后浇带的断面形式,设计图纸应有明确交代,并绘制详图。但有些设计只标注施工后浇带的位置及宽度,对后浇带的断面形式无具体要求,施工单位根据施工条件,一般做成直缝或斜缝,达不到设计要求。
1.4 施工后浇带的钢筋可断开,也可不断。如断开,为防止在同一截面钢筋焊接接头过多,则不宜直接通过一个开间。有的工程设计为施工后浇带,但施工单位却先建主楼,待高层主体完成后,再施工裙房,不留后浇缝,而是预留出钢筋,低层施工时再焊接,这虽是后浇缝的一种变通形式,但施工时未按设计要求做,易带来一些问题,如主楼及裙房板均采用冷轧扭钢筋,在裙房施工时,钢筋焊接造成困难。
2. 施工后浇带施工问题
2.1 施工后浇带的两侧宜采用钢筋支架铅丝网或单层钢板网隔断,并按规定做成企口式,但有的工程采用木模隔断做法,由于钢筋不断,木模缝隙较大;浇筑混凝土不易保证质量。对楼板的后浇带两侧,有的不支模,留成自然槎,更不易保证质量。
2.2 施工后浇带一般预留800 mm宽,钢筋应保证准确位置而连续不断,施工中由于对钢筋的保护措施不力,有些板的钢筋被踩弯或压弯,虽相对数量不多,但若不采取补救措施就浇筑混凝土,则会对板结构受力不利。如某高层建筑与裙房连接处的后浇带,现浇板由于钢筋直径小,后浇带又宽,施工中未采取保护钢筋措施,造成许多钢筋变形,不得不采取补强措施。
2.3 有些施工后浇带不完全按照设计图纸要求施工,设计要求留企口缝,实际留直槎,板的后浇带处不支模板,留成斜坡槎,虽然在浇筑混凝土前经清刷、凿毛,但不认真,疏松混凝土未彻底凿除,使混凝土补齐后连接较差。如某高层商场,裙房与高层连接处的后浇带,用不收缩混凝土补齐后个别处出现了裂缝。
2.4 施工后浇带混凝土一般应待高层主体完成后灌注,但有的高层建筑,施工中途因资金问题停建,建设单位要求将已建成部分先行装修营业;如某高层大厦,地下2层,地上19层,裙房5层,当裙房完成5层,高层完成7层时停建,建设单位要求将5层部分装修营业,何时续建不得而知,此时突出的问题是后浇带如何处理。不浇筑混凝土,不将结构连为整体不能使用;而浇筑混凝土后,高层接建时,沉降问题如何解决,给施工带来了难题。
3. 工程实践分析
3.1 高层主体建筑与低层裙房之间是否需要断开,是应设永久性变形缝,还是设临时性变形缝,或不设缝,要根据地基、基础及上部结构等具体条件区别对待。当建筑物坐在基岩层或卵石层上,或采用桩基、深墩,其沉降变形量很小,遇到这种情况高层主体与裙房基础可做成整体,不必设缝;当地基持力层压缩性高,且厚度较大,在这样的地基上,高层与裙房的差异沉降量较大,宜设永久性变形缝,使高层与裙房彻底脱开;当地基压缩性不高,沉降值差异不大,且沉降完成较快,所留施工后浇带补齐后,连成整体的结构完全可以承受剩余沉降差产生的结构内力,宜设临时性变形缝,即施工后浇带。
3.2 高层主楼与低层裙房间设缝问题,除应考虑地基及上部结构外,尚应考虑建筑平面体形。由于高层主楼的结构刚度与低层裙房的结构刚度相比,相差悬殊,若裙房在主楼一侧伸出较长,则由于建筑物结构刚度中心与质量中心偏心距较大,在地震作用下,上部结构产生扭转影响也较大。一般情况下,若裙房在主楼一侧较长,其与主楼组合起来的总长与高层主楼的长度之比超过2.5时,宜设永久变形缝,将高层与低层结构完全脱开,当然也就不存在施工后浇带的问题;当裙房与主楼总长与主楼长度之比不超过2.5时,则可考虑不设永久变形缝,而设临时变形缝,即施工后浇带,待高层主体完成后浇筑补齐,以减少高低层之间的差异沉降。
3.3 施工后浇带的位置宜选择在结构内力较小的部位,一般选在柱跨三等分的中间部位,或从梁、板的1/3跨部位通过,或从纵横墙相交的部位或门洞口的连接处通过。
3.4 施工后浇带灌注混凝土的时间,原则上应在高层主体结构完工之后,使高层先施工、先沉降,把高层与低层的差异沉降放过一部分,以减少灌注混凝土后差异沉降量。但也要根据情况区别对待,当高层主楼采用天然地基,或以摩擦为主的桩基时,由于高层沉降量较大,应待高层主体结构完成后,再浇筑后浇带;当高层主楼基础坐在卵石层或基岩上,或以端承桩为主的摩擦桩时,由于高层沉降量较小,可根据施工期间的沉降观测,确定在高层主体结构到一定高度时灌注后浇带;当遇到施工中停、缓建时,即裙房已完成,高层完成一部分,建设单位要求对已建成部分装修使用,施工后浇带必须灌注混凝土,这是事先无法预料的,设计部门要面对现实,慎重处理。一般情况下,可按高层与裙房的差异沉降变形来反算内力,这个差异沉降要按实际情况,即已建成裙房和部分高层考虑,将后浇带处的配筋予以加强。此时,因后浇带处两侧混凝土早已浇筑,增加钢筋是有难度的,但也要设法增加钢筋或钢板,使按计算增强的后浇带能够承受日后续建时,由续建的高层与裙房的差异沉降产生增大的结构内力。
参考文献
[1] 赵锡宏等.带裙房的高层建筑与地基基础共同作用设计理论与实践.上海:同济大学出版社1999.
[2] 钢筋混凝土高层建筑结构设计规范与施工规程.
[文章编号]1619-2737(2011)03-02-53
[作者简介] 朱文辉(1983.03.30-),男,籍贯:辽宁省铁岭市,职称:工程师,单位:沈阳海外建设集团有限公司。
鄂宏娜(1982.08.15-),女,籍贯:辽宁省鞍山市,职称:工程师,单位:辽宁丰大房屋开发有限公司。