论文部分内容阅读
位于临夏州永靖县城西南1公里处,距兰州市75公里,是第一个五年计划期间,我国自己设计、自己施工、自己建造的大型水电工程,竣工于 1974年,为黄河上游开发规划中的第七个梯阶电站,兼有发电、防洪、灌溉、养殖、航运、旅游等多各功能。 刘家峡水库存蓄水容量达57亿立方米,水域面积达130多平方公里,呈西南—东北向延伸,达54公里。拦河大坝高达147米,长840米大坝右岸台地上,建筑有长700米,宽
Located in Linxia Prefecture 1 km southwest of Yongjing County, 75 kilometers from Lanzhou City, is the first five-year plan, China’s own design, construction of their own large-scale hydropower projects, completed in 1974 for the Yellow River upstream development planning In the seventh power plant ladder, both generating, flood control, irrigation, farming, shipping, tourism and other functions. Liujiaxia reservoir water storage capacity of 5.7 billion cubic meters, the water area of 130 square kilometers, was southwest - northeastward extension, up to 54 km. Dam up to 147 meters dam, 840 meters long dam on the right bank platform, the building has a long 700 meters wide