论文部分内容阅读
Based on nonlinearity contact theory and the geological structure of the Xieqiao Coal Mine in the newly developed Huainan coal field,rock movements,mining fissures and deformation of overlying strata were simulated by using the interface unit of FLAC3D to evaluate the pressure-relief gas drainage in the exploitation of super-remote protected seams.The simulation indicates that the height of the water flowing fractured zone is 54 m in the overlying strata above the protective layer.The maximum relative swelling deformation of the C13 coal seam is 0.232%,while the mining height is 3.0 m and the distance from the B8 roof to the C13 floor is 129 m,which provides good agreement with a similar experiment and in situ results.The feasibility of exploitation of a super-remote protective coal seam and the performance of the pressure-relief gas drainage in a super-remote protected layer are evaluated by comparisons with practice projects.It demonstrates that the relieved gas in the super-remote protected layers could be better drained and it is feasible to exploit the B8 coal seam before the C13 super-remote protected coal seam.The method is applicable for the study of rock movements,mining fissures and deformation of the overburden,using the interface unit to analyze the contact problems in coal mines.
Based on nonlinear contact contact theory and the geological structure of the Xieqiao Coal Mine in the newly developed Huainan coal field, rock movements, mining fissures and deformation of overlying strata were simulated by using the interface unit of FLAC3D to evaluate the pressure-relief gas drainage in the exploitation of super-remote protected seams. The simulation indicates that the height of the water flowing fractured zone is 54 m in the overlying strata above the protective layer. The maximum relative swelling deformation of the C13 coal seam is 0.232%, while the mining height is 3.0 m and the distance from the B8 roof to the C13 floor is 129 m, which provides good agreement with a similar experiment and in situ results. The feasibility of exploitation of a super-remote protective coal seam and the performance of the pressure -relief gas drainage in a super-remote protected layer are evaluated by comparisons with practice projects. It demonstrates that the relieved gas in the super-remote p rotected layers could be better drained and it is feasible to exploit the B8 coal seam before the C13 super-remote protected coal seam. The method is applicable for the study of rock movements, mining fissures and deformation of the overburden, using the interface unit to analyze the contact problems in coal mines.