论文部分内容阅读
以云南晓街河水库工程泄水建筑物溢洪洞为例,根据溢洪洞布置特点及结构形式,结合水力学计算,对消能方式进行比选和设计,用水力学计算及模型试验,验证了消力池结合潜坝作为消能工的合理性,可为类似工程设计提供一定的参考。
Taking the spillway tunnel of the Xiaofeihe reservoir project in Yunnan as an example, according to the characteristics of spillway tunnel layout and the structure, combined with the hydraulic calculation, the energy dissipation modes are selected and designed, and the hydraulic calculation and model tests are used to verify The combination of power pool and submersible dam as energy dissipater is reasonable, which can provide some reference for similar engineering design.