合武铁路为设计速度200 km/h客货共线铁路,预留250 km/h及以上条件,其土建工程和轨道工程按200 km客货共线标准进行施工图设计。建设过程中铁道部要求合武铁路按250 km/h开通,从土建工程、轨道及四电方面对合武铁路施工图设计标准是否满足动车组开行速度250 km/h的要求进行研究,对不满足250 kmh暂规的设计标准结合合武铁路的实际情况提出了处理意见及加强措施。
For the designed speed of 200 km / h passenger and freight shared railways, the combined railway reserves 250 km / h and above conditions, and civil engineering and orbital engineering works are designed according to the construction standard of 200 km of passenger-cargo lines. During the process of construction, the Ministry of Railways required the Kwu-Wu Railway to be opened at 250 km / h. From the aspects of civil engineering, railways and four electric lines, the design standard of Kwu-Wu Railway construction drawings meets the requirement of 250 km / h of the opening speed of the motor train units. To meet the design standard of 250 kmh temporary regulation, combined with the actual situation of the railway line put forward handling opinions and strengthening measures.