合肥至武汉铁路开通速度250km/h的适应性研究

来源 :铁道标准设计 | 被引量 : 0次 | 上传用户:chunlai_zhang
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
合武铁路为设计速度200 km/h客货共线铁路,预留250 km/h及以上条件,其土建工程和轨道工程按200 km客货共线标准进行施工图设计。建设过程中铁道部要求合武铁路按250 km/h开通,从土建工程、轨道及四电方面对合武铁路施工图设计标准是否满足动车组开行速度250 km/h的要求进行研究,对不满足250 kmh暂规的设计标准结合合武铁路的实际情况提出了处理意见及加强措施。 For the designed speed of 200 km / h passenger and freight shared railways, the combined railway reserves 250 km / h and above conditions, and civil engineering and orbital engineering works are designed according to the construction standard of 200 km of passenger-cargo lines. During the process of construction, the Ministry of Railways required the Kwu-Wu Railway to be opened at 250 km / h. From the aspects of civil engineering, railways and four electric lines, the design standard of Kwu-Wu Railway construction drawings meets the requirement of 250 km / h of the opening speed of the motor train units. To meet the design standard of 250 kmh temporary regulation, combined with the actual situation of the railway line put forward handling opinions and strengthening measures.
其他文献
四电系统集成的安全性是实现高速铁路高效可靠运营的基础和保证。以郑西客运专线四电系统为例,建立系统评价指标体系,利用改进AHP确定各个评价指标的权重向量和隶属度矩阵,并结
采用溶胶-凝胶法将H3BO3引入到Al(OH)3透明溶胶,经多次成膜-干燥-烧成制得具备一定脱硫效果的γ-Al2O3复合膜,以探索烟气脱硫的新方法.用扫描电镜、X射线衍射、BET(Brunauer-
ABB厦门工业中心测试塔巨型钢柱分为2种形式,下部为格构柱,上部为实腹式焊接H型钢柱,且上下宽度不一样,柱脚形式为插入式杯口基础。为此,对插入式钢柱的轴线、标高误差调整问
南通市通州区城市展览馆工程采用了双层幕墙体系,其中与内侧幕墙净间距1200mm的悬臂斜框外幕墙为铝单板遮阳幕墙。施工中通过采用悬挑支架辅助悬臂斜框铝单板幕墙安装施工,利
重庆来福士广场项目塔楼外立面呈曲线造型,在彰显艺术感的同时,也给结构施工带来了一定的难度.为此,结合工程特点,采用曲线立面高空悬挑型钢施工技术,成功地解决了水平结构随
用络合溶胶—凝胶法合成了化学组成为CaZr4(PO4)6(CZP)的NaZr2(PO4)3(NZP)族磷酸盐陶瓷的粉体。初步研究了制备条件对粉体物相和粒径及粒径分布的影响。添加ZnO为烧结助剂,将CZP粉体在
介绍冻土区热融滑塌的机理,分析影响其稳定性的各项因素,包括冻融交界面位置和暖季强降雨等因素;采用现场实例评价了目前关于冻土边坡稳定性5种计算方法,且利用改进极限平衡法评