论文部分内容阅读
为适应地震监测工作需要而兴建的康定水化综合台已于1985年建成,经四川省地震局现场验收合格(封底照片1)。该台目前配有分光光度计、酸度计、电导率仪、测氡仪(封底照片2)、火焰光度计、气相色谱仪(封底照片3)等主要仪器设备。并先后对姑咱海子(封底照片4)和康定龙头沟等水、泉点,开展多种离子和气体成分及有关项目的试验观测。康定水化综合台地理位置优越、设计统一合理、配套设施
The Kangding hydration integrated station, built to meet the needs of seismic monitoring work, was completed in 1985 and passed the on-site inspection by the Sichuan Seismological Bureau (back cover photo 1). The station is equipped with spectrophotometer, pH meter, conductivity meter, radon detector (back cover photo 2), flame photometer, gas chromatograph (back cover photo 3) and other major equipment. And has a Guzhai Haizi (back cover photos 4) and Kangding faucet and other water, spring point, to carry out a variety of ion and gas composition and related experimental observations. Kangding hydration comprehensive geographical location, design uniform and reasonable, supporting facilities