我公司承建一座贮水量200 m~3、高28 m的保温水塔。有效工期仅一个月。为此,我们采用了几项非常规快速施工技术,不但仅用25 d 就完成了任务,而且质量达到优良标准。现简要介绍如下。一、筒身砌筑采用周转上升式操作平台和钢索吊篮运输水塔传统施工采用外脚手架并设置一座龙门架进行垂直运输,这种方法不但耗用大
Our company has built a thermal water tower with a water storage capacity of 200 m~3 and a height of 28 m. The effective duration is only one month. To this end, we have adopted several unconventional rapid construction techniques. We have not only completed tasks within 25 days, but also achieved excellent standards of quality. The brief introduction is as follows. 1. Ladle masonry adopts a turnover-rising operating platform and steel cable baskets to transport water towers. Traditional construction uses external scaffolds and sets up a gantry for vertical transportation. This method not only consumes large amounts of energy.