对混凝土浇注过程进行全程分析。采用温度调控的方法控制混凝土的总应力,充分考虑混凝土在早期的快速收缩应力,有针对性考虑浇筑方式,最大限度地降低混凝土应力,以达到防止混凝土出现裂缝的目的。
Full analysis of the concrete pouring process. The method of temperature control is used to control the total stress of concrete, the rapid shrinkage stress of concrete is taken into full consideration, and the pouring method is considered in a targeted manner to minimize the stress of concrete so as to prevent the concrete from cracking.