二十世纪八十年代以前,我国的坝基防渗技术比较落后,施工方法比较单一,大多数采用传统粘土铺盖、灌浆、粘土截水槽等相关措施。改革开放以来,通过大量的科学实验以及工程实践,我国的水工防渗加固技术发展很快,施工方法、施工设备得到不断改进,施工效率得到了不断的提高,近年来我国的防渗墙施工水平也已经达到了国际先进水平。
Before the 1980s, dam foundation seepage control technology in our country lags behind. The construction methods are relatively simple. Most of them use the traditional clay covering, grouting, clay intercepting trough and other related measures. Since the reform and opening up, through a large number of scientific experiments and engineering practice, the hydraulic impermeability and reinforcement technology in China has developed rapidly. The construction methods and construction equipment have been continuously improved, and the construction efficiency has been continuously improved. In recent years, the impervious wall construction The level has also reached the international advanced level.