泰国曼谷马哈沙瓦特水厂二期输水泵站G-TR-6工程是葛洲坝集团公司(以下简称集团公司)在泰国承包的第一个工程。由于受泰国劳工法的限制和其他因素的影响,该工程施工所采用的管理模式是“整体分割,单项分包”,即整个工程按项目的专业类别或部位分成若干部分,然后分包给30
The G-TR-6 project of the second-phase water pumping station in Maharashtra Water Plant in Bangkok, Thailand, was the first project contracted by Gezhouba Group Corporation (hereinafter referred to as “Group Company”) in Thailand. Due to the restrictions of Thai labor law and other factors, the management mode used in the project construction is “integrally divided, single subcontracted,” that is, the entire project is divided into several parts according to the professional category or location of the project, and then subcontracted to 30.