北京“前三门”工程,前排共有高层建筑37栋,其中21栋采用了钻孔灌注桩基础,建筑面积达228000平方米,钻桩总数约1万根,总进尺约10万米。我国高层建筑采用钻孔灌注桩尚属初期阶段,在地震区大量推广应用更缺少经验。通过“前三门”工程设计、施工实践,以及压桩、静力触探、沉降观测等科学实验,对这种桩基础的设计,已取得一些经验,同时也发现一些问题。为了对今后设计提供资料和更好地开展科研工作,现简介如下,供参考。
In Beijing’s “three fronts” project, there are 37 high-rise buildings in the front row, of which 21 use cast-in-place pile foundations, a building area of 228,000 square meters, a total of about 10,000 drill piles, and a total footage of about 100,000 meters. The use of cast-in-place piles for high-rise buildings in China is still in the initial stage, and there is a large number of applications in the earthquake area that are even less inexperienced. Through the “first three” project design, construction practices, and scientific experiments such as pile driving, static penetration testing and settlement observation, some experience has been gained in the design of such pile foundations, and some problems have also been discovered. In order to provide information for future design and conduct scientific research work better, the following is a brief introduction for reference.