论文部分内容阅读
科学技术的发展和工程建设的需要,原有的盾构掘进机势必要发展成为适应性强,功能多,能够软硬兼施和掘进效率高的新型盾构掘进机。而我国的特殊盾构隧道的新工法,如MF盾构法,偏心多轴盾构法,自由断面盾构法,球体盾构法盾构掘进机的设计研究,制造已发展到了相当水平。
With the development of science and technology and the need of engineering construction, the original shield tunneling machine needs to be developed into a new type of shield TBM with strong adaptability, multiple functions, both soft and hard and high tunneling efficiency. The new method of special shield tunnel in our country, such as the MF shield method, the eccentric multi-axis shield method, the free section shield method, the ball shield shield boring machine design and research, has been developed to a considerable level.