论文部分内容阅读
对淮安市楚州茭陵泵站更新加固过程中门槽混凝土拆除后植筋锚固的方案设计、参数选择及施工方法进行阐述,并提出了几点注意事项,为同类工程施工提供经验借鉴。
The scheme design, parameter selection and construction method of planting bar anchorage after the concrete removal of gate trough in the process of renewal and reinforcement of Chu Ling Gu Ling Pumping Station in Huaian City are described. Some considerations are put forward to provide reference for the construction of similar projects.