论文部分内容阅读
甘肃工业大学水机教研室设计了一种全贯流微型整装水轮发电机组,其中直径为300毫米的机组,已安装在武威县南营卿进行运转考验。该机组具有两个伸出轴,其一供联接发电机之用,其二供联接水泵或带动加工机械之用,在轴端装有一制动机构,可在水轮机正常通水情况下进行制动。在输出轴两轴端装有两对联轴器,它们均可在制动状态下进行脱开或联接,以便随时根据工作需要带动或脱开发电机及其他机械,见图1。该机组通过一对伞齿轮进行增速传动。由于转轮叶片不
Gansu Polytechnic University Water Department designed a full-flow micro-integrated turbine unit, of which 300 mm diameter unit has been installed in Wuwei County, South Camping for operational testing. The unit has two protruding shafts, one of which is used for connecting the generator, the other for connecting the water pump or driving the processing machinery, and a braking mechanism is arranged at the shaft end for braking under the normal water flow condition of the turbine . Both ends of the output shaft are equipped with two pairs of couplings, which can be disengaged or connected under the braking state so as to drive or disengage generators and other machinery at any time according to the needs of work, as shown in FIG. 1. The unit through a pair of bevel gear for transmission. Because the rotor blades do not