论文部分内容阅读
水利水电工程造价控制与管理需要在整个工程建设过程中综合运用多种手段,本文主要就当前水利水电工程建设阶段成本控制的问题进行分析,并提出了实现水利水电施工阶段成本控制最优化的有效建议。
The cost control and management of water conservancy and hydropower projects need to comprehensively use a variety of means in the entire project construction process. This paper mainly analyzes the current cost control issues in the construction phase of water conservancy and hydropower projects and puts forward some measures to optimize the cost control in the construction phase of water conservancy and hydropower projects Suggest.