论文部分内容阅读
苏联在工业、交通、城市建设的发展,引起对建筑材料与资金的耗费较大,各种建筑工程中,也包括挡土墙一项。尤以在山岳和丘陵地区特别明显。如果对其他结构类型不必要采取整体性“现场就地灌注”的话,据记载下列结构可以减少投资20~30%。这将便于在北极地区和冬季施工。由钢筋混凝土槽形构件形组成的结构(见图1),这种结构在顶面找平台,向上逐个循环安设。在挡土墙后面向槽内自由进行填土,形成自然的斜面。
The development of the Soviet Union in industry, transportation and urban construction has caused a great expenditure on construction materials and capital. In various construction projects, it also includes a retaining wall. Especially in the mountains and hilly areas particularly evident. The following structure is documented to reduce investment by 20-30% if it is not necessary to take a holistic “in-situ infusion” of other types of structures. This will facilitate construction in the Arctic and in winter. The structure made of reinforced concrete trough-shaped components (see Figure 1), this structure to find the platform on the top, set up one by one cycle up. Behind the retaining wall to the tank free to fill, forming a natural slope.