【摘 要】
:
编制工程进度计划必须事先制定一个切实可行的科学的进度计划。在制定工程进度计划时要有一定的预见性和前瞻性,使进度计划符合变化后的施工条件。在了解和熟悉图纸的基础上,
论文部分内容阅读
编制工程进度计划必须事先制定一个切实可行的科学的进度计划。在制定工程进度计划时要有一定的预见性和前瞻性,使进度计划符合变化后的施工条件。在了解和熟悉图纸的基础上,根据合同要求编好工程进度计划。为了搞好土建与安装的配合工作,在编制进度计划时要请安装人员参加。根据进度计划配置人数、机械设备和周转材料,从而确保工程进度。
The preparation of the project schedule must be made in advance of a scientific and scientific progress plan. In the development of the project schedule must have a certain foresight and forward-looking, so that the progress of the plan in line with the changing construction conditions. On the basis of knowing and being familiar with the drawings, according to the requirements of the contract, compile the schedule of the project. In order to do a good job with the civil works and installation work, in the preparation of the schedule, please ask the installer to attend. The number of people, machinery, and turnaround materials are allocated according to the schedule to ensure project progress.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
创新是一个民族进步的灵魂,是国家兴旺发达的不竭动力。当今世界,创新越来越成为社会生产解放和发展的重要标志,决定着一个国家、一个民族的发展进程。正是基于这样的时代背
请下载后查看,本文暂不支持在线获取查看简介。
Please download to view, this article does not support online access to view profile.
各学校:为宣传《中华人民共和国科学技术普及法》,贯彻落实科技部、教育部、中宣部、中国科协、团中央制订的《2001-2005中国青少年科学技术普及活动指导纲要》的精神,利用互
三强实业集团始建于1998年,是香河县重点企业之一。集团下设香河县城镇房地产综合开发有限公司、三强建筑工程有限公司、三强水厂、三强热力站、三强污水处理厂、三强信用担
本文比较了肌肉 CT、活检和肌电图(EMG)对神经肌肉疾病(neuromuscular diseases,NMI))的辅助诊断价值。方法患者53例,男33、女20例。肌病34例,神经元病19例。全部病例均行肌
国庆前夕的9月29日,“天宫一号”飞上太空,将中国人民的自豪和尊严提升到一个新的高度。 也就是这一天,由科技部、中国科学院、北京市政府等联合主办的中关村论坛年会在国家会议中心隆重举行,来自海内外的重量级嘉宾共同探讨中关村如何引领、提升中国经济转型和产业升级的严肃话题。 其实,这两个事件有着密切和必然的联系。因为细心的读者已经从“天宫一号”的新闻中了解到,这一中国首个目标飞行器的研制者卫星制造厂
教师批改学生作业的过程不是一个简单机械性的重复劳动,而是一种复杂的、具有创意的过程,需要教师凭着对教育事业的执着追求,凭着对学生高度负责的精神,才能够把学生的作业批
对中小企业的扶持要落到实处从7月开始,对中小企业的扶持从政策、信贷到行业准入,纷至沓来。中小企业扶持举措既有国际经验,也有中国特色。国际经验包括补贴、税收优惠等,国
上九年级的小明和小光学习了酸碱知识后,对部分日常生活用品的酸碱度进行了测定。分析测定结果,他们发现各类洗发液的pH差别较大,约在7~9之间,护发素的pH均略小于7。联想到人